New benchmark results for the resource - Constrained project scheduling problem

被引:144
作者
Demeulemeester, EL
Herroelen, WS
机构
[1] Department of Applied Economics, Katholieke Universiteit Leuven, B-3000 Leuven
关键词
project scheduling resource constraints; branch-and-bound; 32-bit programming; computational results;
D O I
10.1287/mnsc.43.11.1485
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper reports on new insights derived from computational results obtained with an updated version of the branch-and-bound procedure previously developed by Demeulemeester and Herroelen (1992) for solving the resource-constrained project scheduling problem (RCPSP). The new code fully exploits the advantages of 32-bit programming provided by recent compilers running on platforms such as Windows NT(R) and OS/2(R): flat memory, increased addressable memory, and fast program execution. We study the impact of three important variables on the computation time for the RCPSP: addressable computer memory, the search strategy (depth-first, best-first, or hybrid), and the introduction of a stronger lower bound. We compare the results obtained by a truncated branch-and-bound procedure with the results generated by the minimum slack time heuristic and report on the dependency of its solution quality on the allotted CPU time.
引用
收藏
页码:1485 / 1492
页数:8
相关论文
共 21 条
[1]  
[Anonymous], REV FRANCAISE RECHER
[2]  
[Anonymous], ADV PROJECT SCHEDULI
[3]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[4]   HEURISTICS FOR SCHEDULING RESOURCE CONSTRAINED PROJECTS - EXPERIMENTAL INVESTIGATION [J].
COOPER, DF .
MANAGEMENT SCIENCE, 1976, 22 (11) :1186-1194
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818
[7]  
DEMEULEMEESTER E, 1995, 9521 K U LEUV DEP AP
[8]  
Demeulemeester E., 1992, THESIS KATHOLIEKE U
[9]   ALGORITHMS FOR PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS [J].
ELSAYED, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :95-103
[10]  
KILISCH R, 1996, EUROPEAN J OPER RES, V90, P320