Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed

被引:22
作者
Cavalieri, S
Macchi, M
Valckenaers, P
机构
[1] Univ Bergamo, Dipartimento Ingn, I-24044 Dalmine, BG, Italy
[2] Politecn Milan, Dipartimento Ingn Gest, I-20133 Milan, Italy
[3] Katholieke Univ Leuven, Dept Engn Mech, PMA, B-3001 Louvain, Belgium
关键词
scheduling and control; simulation; object-oriented; benchmarking;
D O I
10.1023/A:1022287212706
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper reports the main research activities currently carried out for designing and developing a test-bench service. This service would act as the main reference point for establishing benchmarks on which research results can be compared. These benchmarks will be made available through web technology. The paper, after a first outline of the main features of the project and its overall vision, is particularly focused both on the design principles related to the construction of good benchmark cases and on the technological issues related to the provision of a web-based simulation environment for supporting interactivity between remote scheduling and control systems and a locally resident simulation system.
引用
收藏
页码:43 / 58
页数:16
相关论文
共 16 条
[1]  
BARTOLOTTA A, 1998, 6154 NISTIR US DEP C
[2]  
BONGAERTS L, 1999, P 2 INT WORKSH INT M
[3]   Performance comparison and analysis of reactive and planning-based control architectures for manufacturing [J].
Brennan, RW .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2000, 16 (2-3) :191-200
[4]  
BRENNAN RW, 1997, P 1997 WINT SIM C, P880
[5]  
Bussmann S., 1999, P 2 INT WORKSH INT M, P177
[6]   An experimental benchmarking of two multi-agent architectures for production scheduling and control [J].
Cavalieri, S ;
Garetti, M ;
Macchi, M ;
Taisch, M .
COMPUTERS IN INDUSTRY, 2000, 43 (02) :139-152
[7]  
CAVALIERI S, 1999, P 2 INT WORKSH INT M, P225
[8]   THE EVOLUTION OF CONTROL ARCHITECTURES FOR AUTOMATED MANUFACTURING SYSTEMS [J].
DILTS, DM ;
BOYD, NP ;
WHORMS, HH .
JOURNAL OF MANUFACTURING SYSTEMS, 1991, 10 (01) :79-93
[9]  
DRUMMOND M, 1995, SCHEDULING BENCHMARK
[10]  
HANKS S, 1993, AI MAG, V14, P17