Reflections on Enacted Sensemaking in the Bhopal Disaster

被引:186
作者
Weick, Karl E. [1 ]
机构
[1] Univ Michigan, Ross Sch Business, Ann Arbor, MI 48109 USA
关键词
HIGH-RELIABILITY; ORGANIZATIONS; CRISIS;
D O I
10.1111/j.1467-6486.2010.00900.x
中图分类号
F [经济];
学科分类号
02 ;
摘要
P>An updated analysis of the Bhopal disaster suggests that problems of abduction, awareness, reliability, and certainty were more serious than was first thought. Expanded analysis shows that the tight coupling between cognition and action, normally associated with enacted sensemaking, broke down at Bhopal. The breakdowns included a low standard of plausibility, minimal doubt, infrequent updating of both mental models and current hunches, and mindless action. The modest enactment that did occur prolonged rather than shortened the crisis.
引用
收藏
页码:537 / 550
页数:14
相关论文
共 52 条
[31]  
Mills J.H., 2003, MAKING SENSE ORG CHA
[32]  
Patriotta G., 2004, ORG KNOWLEDGE MAKING
[33]  
Perin Constance., 2005, Shouldering Risks: The Culture of Control in the Nuclear Power Industry
[34]  
Perrow C., 1984, Normal accidents
[35]   Integrating Science and Practice: Adopting the Pasteurian Model [J].
Reich, John W. .
REVIEW OF GENERAL PSYCHOLOGY, 2008, 12 (04) :365-377
[36]  
Reynolds L.T., 2003, HDB SYMBOLIC INTERAC, P39
[37]   SOME CHARACTERISTICS OF ONE TYPE OF HIGH RELIABILITY ORGANIZATION [J].
Roberts, Karlene H. .
ORGANIZATION SCIENCE, 1990, 1 (02) :160-176
[38]  
ROUXDUFORT C, 2007, HDB ORG CRISIS MANAG, P221
[39]   THE NEGOTIATED ORDER OF ORGANIZATIONAL RELIABILITY [J].
SCHULMAN, PR .
ADMINISTRATION & SOCIETY, 1993, 25 (03) :353-372
[40]  
Shrivastava Paul., 1987, Bhopal: Anatomy of Crisis