Integer programming with random-boundary intervals for planning municipal power systems

被引:14
作者
Cao, M. F. [2 ]
Huang, G. H. [1 ]
Lin, Q. G. [3 ]
机构
[1] Univ Regina, Fac Engn, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] N China Elect Power Univ, Sinocanada Ctr Energy & Environm Res, Beijing 102206, Peoples R China
[3] Univ Regina, Environm Canada, Adaptat & Impacts Res Grp, Ctr Studies Energy & Environm, Regina, SK S4S 0A2, Canada
关键词
Random-boundary interval; Integer-interval; Uncertainty; Correlation; Electricity supply planning; SOLID-WASTE MANAGEMENT; AIR-QUALITY MANAGEMENT; ENERGY-SYSTEMS; OPTIMIZATION APPROACH; MODEL; UNCERTAINTY;
D O I
10.1016/j.apenergy.2010.03.005
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Uncertainty attached to municipal power systems has long been crucial considerations for the related planners. Such an uncertainty could be expressed as random-boundary intervals (RBIs) In this study, an integer programming with random-boundary intervals (IPRBI) approach was developed for municipal electricity-supply management under uncertainty A concept of random-boundary interval (RBI) was introduced to reflect dual uncertainties that exist in many system components A solution method named two-boundary approach (TBA) was proposed to solve the IPRBI model. A case study was provided for demonstrating applicability of the developed method The results indicated that the RBI and integer-interval concepts were effective in dealing with highly uncertain parameters The IPRBI method solutions could be used for generating efficient electricity-supply schemes under various complexities They can also be used for analyzing tradeoffs between system cost and electricity-shortage risk. Compared with the existing methods. IPRBI was advantageous in reflecting the complexities of system uncertainties that were presented as RBIs, integer-intervals and intervals. Crown Copyright (C) 2010 Published by Elsevier Ltd All rights reserved.
引用
收藏
页码:2506 / 2516
页数:11
相关论文
共 45 条
[41]   Capacity expansion and replacement in growing markets with uncertain technological breakthroughs [J].
Rajagopalan, S ;
Singh, MR ;
Morton, TE .
MANAGEMENT SCIENCE, 1998, 44 (01) :12-30
[42]   A MILP model for integrated plan and evaluation of distributed energy systems [J].
Ren, Hongbo ;
Gao, Weijun .
APPLIED ENERGY, 2010, 87 (03) :1001-1014
[43]   An interval-parameter stochastic robust optimization model for supporting municipal solid waste management under uncertainty [J].
Xu, Y. ;
Huang, G. H. ;
Qin, X. S. ;
Cao, M. F. ;
Sun, Y. .
WASTE MANAGEMENT, 2010, 30 (02) :316-327
[44]   Applications of Simulation-Optimization Methods in Environmental Policy Planning Under Uncertainty [J].
Yeomans, J. S. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2008, 12 (02) :174-186
[45]  
INFOR