Resource-constrained project scheduling: A survey of recent developments

被引:355
作者
Herroelen, W [1 ]
De Reyck, B [1 ]
Demeulemeester, E [1 ]
机构
[1] Catholic Univ Louvain, Dept Appl Econ, Operat Management Grp, B-3000 Louvain, Belgium
关键词
D O I
10.1016/S0305-0548(97)00055-5
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We review recent advances in dealing with the resource-constrained project scheduling problem using an efficient depth-first branch-and-bound procedure, elaborating on the branching scheme, bounding calculations and dominance rules, and discuss the potential of using truncated branch-and-bound. We derive conclusions from the research on optimal solution procedures for the basic problem and subsequently illustrate extensions to a rich and realistic variety of related problems involving activity preemption, the use of ready times and deadlines, variable resource requirements and availabilities, generalized precedence relations, time/cost, time/resource and resource/resource trade-offs and non-regular objective functions. (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:279 / 302
页数:24
相关论文
共 75 条
[1]  
[Anonymous], REV FRANCAISE RECHER
[2]  
BALAS E, 1971, APPL MATH PROGRAMMIN, P187
[3]  
Bartusch M., 1988, Annals of Operations Research, V16, P201
[4]   OPTIMAL REDUCTION OF 2-TERMINAL DIRECTED ACYCLIC GRAPHS [J].
BEIN, WW ;
KAMBUROWSKI, J ;
STALLMANN, MFM .
SIAM JOURNAL ON COMPUTING, 1992, 21 (06) :1112-1129
[5]  
BELL CE, 1990, NAV RES LOG, V37, P61, DOI 10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO
[6]  
2-S
[7]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[8]   THE SCHEDULE-SEQUENCING PROBLEM [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1959, 7 (05) :621-624
[9]  
CARLIER J, 1991, RAIRO-RECH OPER, V25, P311
[10]   ADVANCES IN CRITICAL PATH METHODS [J].
CARRUTHERS, JA ;
BATTERSBY, A .
OPERATIONAL RESEARCH QUARTERLY, 1966, 17 (04) :359-+