Resource-constrained project scheduling: A survey of recent developments

被引:355
作者
Herroelen, W [1 ]
De Reyck, B [1 ]
Demeulemeester, E [1 ]
机构
[1] Catholic Univ Louvain, Dept Appl Econ, Operat Management Grp, B-3000 Louvain, Belgium
关键词
D O I
10.1016/S0305-0548(97)00055-5
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We review recent advances in dealing with the resource-constrained project scheduling problem using an efficient depth-first branch-and-bound procedure, elaborating on the branching scheme, bounding calculations and dominance rules, and discuss the potential of using truncated branch-and-bound. We derive conclusions from the research on optimal solution procedures for the basic problem and subsequently illustrate extensions to a rich and realistic variety of related problems involving activity preemption, the use of ready times and deadlines, variable resource requirements and availabilities, generalized precedence relations, time/cost, time/resource and resource/resource trade-offs and non-regular objective functions. (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:279 / 302
页数:24
相关论文
共 75 条
[41]   MULTI-PROJECT SCHEDULING - ANALYSIS OF PROJECT PERFORMANCE [J].
KURTULUS, IS ;
NARULA, SC .
IIE TRANSACTIONS, 1985, 17 (01) :58-66
[42]   EXPERIMENTAL INVESTIGATION AND COMPARATIVE EVALUATION OF PRODUCTION LINE BALANCING TECHNIQUES [J].
MASTOR, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (11) :728-746
[43]  
MOODIE CL, 1966, J IND ENGINEERING, V17, P377
[44]   HEURISTICS FOR THE MINIMUM PROJECT DURATION PROBLEM WITH MINIMAL AND MAXIMAL TIME LAGS UNDER FIXED RESOURCE CONSTRAINTS [J].
NEUMANN, K ;
ZHAN, J .
JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (02) :145-154
[45]   A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
OZDAMAR, L ;
ULUSOY, G .
IIE TRANSACTIONS, 1995, 27 (05) :574-586
[46]  
Patterson J. H., 1976, AIIE Transactions, V8, P449, DOI 10.1080/05695557608975107
[47]   COMPUTATIONAL EXPERIENCE WITH A BACKTRACKING ALGORITHM FOR SOLVING A GENERAL-CLASS OF PRECEDENCE AND RESOURCE-CONSTRAINED SCHEDULING PROBLEMS [J].
PATTERSON, JH ;
TALBOT, FB ;
SLOWINSKI, R ;
WEGLARZ, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :68-79
[48]   HORIZON-VARYING, ZERO-ONE APPROACH TO PROJECT SCHEDULING [J].
PATTERSON, JH ;
HUBER, WD .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (06) :990-998
[49]   A COMPARISON OF EXACT APPROACHES FOR SOLVING THE MULTIPLE CONSTRAINED RESOURCE, PROJECT SCHEDULING PROBLEM [J].
PATTERSON, JH .
MANAGEMENT SCIENCE, 1984, 30 (07) :854-867
[50]   PROJECT SCHEDULING - EFFECTS OF PROBLEM STRUCTURE ON HEURISTIC PERFORMANCE [J].
PATTERSON, JH .
NAVAL RESEARCH LOGISTICS, 1976, 23 (01) :95-123