PROJECT SCHEDULING - EFFECTS OF PROBLEM STRUCTURE ON HEURISTIC PERFORMANCE

被引:99
作者
PATTERSON, JH [1 ]
机构
[1] PENN STATE UNIV,DEPT MANAGEMENT SCI & ORG BEHAV,UNIVERSITY PK,PA 16802
关键词
PROJECT SCHEDULING;
D O I
10.1002/nav.3800230110
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Individual characteristics of multiple-constrained resource, project scheduling problems are examined in an attempt to predict the solution obtainable with heuristic methods. Difficulties encountered in performing this type of research are described, and several multiple regression models are developed for predicting heuristic performance. Both single and multiple project data are examined, and results reported demonstrate the efficacy of determining beforehand the method used for problem solution.
引用
收藏
页码:95 / 123
页数:29
相关论文
共 18 条
[1]  
BRAND JD, 1964, 5 U ILL DEP CIV ENG
[2]  
DAVIES ME, 1973, TRANSPORTATION ENGIN, V99, P741
[3]  
Davis E. W., 1973, AIIE T, V5, P297
[4]  
DAVIS EH, TO BE PUBLISHED
[5]  
DAVIS EW, 1971, MANAGE SCI B-APPL, V17, pB803
[6]  
DAVIS EW, 1973, HBS7315 HARV U GRAD
[7]  
DAVIS EW, 1973, HBS7334 HARV U GRAD
[8]  
DAVIS EW, 1969, THESIS YALE U
[9]  
FENDLEY LG, 1968, J IND ENGINEERING, V19, P505
[10]  
Johnson TJR, 1967, THESIS MASSACHUSETTS