PROJECT SCHEDULING - EFFECTS OF PROBLEM STRUCTURE ON HEURISTIC PERFORMANCE

被引:99
作者
PATTERSON, JH [1 ]
机构
[1] PENN STATE UNIV,DEPT MANAGEMENT SCI & ORG BEHAV,UNIVERSITY PK,PA 16802
关键词
PROJECT SCHEDULING;
D O I
10.1002/nav.3800230110
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Individual characteristics of multiple-constrained resource, project scheduling problems are examined in an attempt to predict the solution obtainable with heuristic methods. Difficulties encountered in performing this type of research are described, and several multiple regression models are developed for predicting heuristic performance. Both single and multiple project data are examined, and results reported demonstrate the efficacy of determining beforehand the method used for problem solution.
引用
收藏
页码:95 / 123
页数:29
相关论文
共 18 条
[11]  
MIZE JH, 1964, THESIS PURDUE U
[12]  
PASCOE TL, 1965, THESIS CAMBRIDGE U
[13]   HORIZON-VARYING, ZERO-ONE APPROACH TO PROJECT SCHEDULING [J].
PATTERSON, JH ;
HUBER, WD .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (06) :990-998
[14]   ALTERNATE METHODS OF PROJECT SCHEDULING WITH LIMITED RESOURCES [J].
PATTERSON, JH .
NAVAL RESEARCH LOGISTICS, 1973, 20 (04) :767-784
[15]  
PATTERSON JH, 1972, 3RD P INT C PROJ PLA, P294
[16]  
Wiest J. D., 1967, MANAGE SCI, V13, P359, DOI DOI 10.1287/MNSC.13.6.B359
[17]   SOME PROPERTIES OF SCHEDULES FOR LARGE PROJECTS WITH LIMITED RESOURCES [J].
WIEST, JD .
OPERATIONS RESEARCH, 1964, 12 (03) :395-&
[18]  
[No title captured]