Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning

被引:81
作者
Li, Y. P.
Huang, G. H. [1 ]
Nie, S. L.
机构
[1] Univ Regina, Fac Engn, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] N China Elect Power Univ, Beijing Key Lab Energy Secur & Clean Prod, Energy & Environm Res Ctr, Beijing 102206, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
decision-making; environment; flood diversion; fuzzy sets; interval optimization; stochastic programming; uncertainty;
D O I
10.1080/03052150601044831
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Innovative prevention, adaptation, and mitigation approaches as well as policies for sustainable flood management continue to be challenges faced by decision-makers. In this study, a mixed interval-fuzzy two-stage integer programming (IFTIP) method is developed for flood-diversion planning under uncertainty. This method improves upon the existing interval, fuzzy, and two-stage programming approaches by allowing uncertainties expressed as probability distributions, fuzzy sets, and discrete intervals to be directly incorporated within the optimization framework. In its modelling formulation, economic penalties as corrective measures against any infeasibilities arising because of a particular realization of the uncertainties are taken into account. The method can also be used for analysing a variety of policy scenarios that are associated with different levels of economic penalties. A management problem in terms of flood control is studied to illustrate the applicability of the proposed approach. The results indicate that reasonable solutions have been generated. They can provide desired flood-diversion alternatives and capacity-expansion schemes with a minimized system cost and a maximized safety level. The developed IFTIP is also applicable to other management problems that involve uncertainties presented in multiple formats as well as complexities in policy dynamics.
引用
收藏
页码:163 / 183
页数:21
相关论文
共 52 条
[1]   A finite branch-and-bound algorithm for two-stage stochastic integer programs [J].
Ahmed, S ;
Tawarmalani, M ;
Sahinidis, NV .
MATHEMATICAL PROGRAMMING, 2004, 100 (02) :355-377
[2]   Aggregation of fuzzy views of a large number of stakeholders for multi-objective flood management decision-making [J].
Akter, T ;
Simonovic, SP .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2005, 77 (02) :133-143
[3]   Field Measurements and Flow Modeling of Overbank Flows in River Severn, UK [J].
Babaeyan-Koopaei, K. ;
Ervine, D. A. ;
Pender, G. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2003, 1 (01) :28-36
[4]   CAPACITY PLANNING FOR WASTE MANAGEMENT-SYSTEMS [J].
BAETZ, BW .
CIVIL ENGINEERING SYSTEMS, 1990, 7 (04) :229-235
[5]   Multicriteria evaluation of flood control measures: The case of Ribeira do Livramento [J].
Bana E Costa, CA ;
da Silva, PA ;
Correia, FN .
WATER RESOURCES MANAGEMENT, 2004, 18 (03) :263-283
[6]  
BEALE EML, 1955, J ROY STAT SOC B, V17, P173
[7]  
Birge J.R., 1997, INTRO STOCHASTIC PRO
[8]   A MULTICUT ALGORITHM FOR 2-STAGE STOCHASTIC LINEAR-PROGRAMS [J].
BIRGE, JR ;
LOUVEAUX, FV .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 34 (03) :384-392
[9]   Implementation of flood risk management measures into spatial plans and policies [J].
Böhm, HR ;
Haupter, B ;
Heiland, P ;
Dapp, K .
RIVER RESEARCH AND APPLICATIONS, 2004, 20 (03) :255-267
[10]   Three-person multi-objective conflict decision in reservoir flood control [J].
Cheng, CT ;
Chau, KW .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 142 (03) :625-631