Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning

被引:81
作者
Li, Y. P.
Huang, G. H. [1 ]
Nie, S. L.
机构
[1] Univ Regina, Fac Engn, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] N China Elect Power Univ, Beijing Key Lab Energy Secur & Clean Prod, Energy & Environm Res Ctr, Beijing 102206, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
decision-making; environment; flood diversion; fuzzy sets; interval optimization; stochastic programming; uncertainty;
D O I
10.1080/03052150601044831
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Innovative prevention, adaptation, and mitigation approaches as well as policies for sustainable flood management continue to be challenges faced by decision-makers. In this study, a mixed interval-fuzzy two-stage integer programming (IFTIP) method is developed for flood-diversion planning under uncertainty. This method improves upon the existing interval, fuzzy, and two-stage programming approaches by allowing uncertainties expressed as probability distributions, fuzzy sets, and discrete intervals to be directly incorporated within the optimization framework. In its modelling formulation, economic penalties as corrective measures against any infeasibilities arising because of a particular realization of the uncertainties are taken into account. The method can also be used for analysing a variety of policy scenarios that are associated with different levels of economic penalties. A management problem in terms of flood control is studied to illustrate the applicability of the proposed approach. The results indicate that reasonable solutions have been generated. They can provide desired flood-diversion alternatives and capacity-expansion schemes with a minimized system cost and a maximized safety level. The developed IFTIP is also applicable to other management problems that involve uncertainties presented in multiple formats as well as complexities in policy dynamics.
引用
收藏
页码:163 / 183
页数:21
相关论文
共 52 条
[31]   A linear two-stage stochastic programming problem with quantile criterion: Its discrete approximation [J].
Kibzun, AI ;
Nikulin, IV .
AUTOMATION AND REMOTE CONTROL, 2001, 62 (08) :1339-1348
[32]   A 2-STAGE APPROACH FOR LARGE-SCALE SEWER SYSTEMS-DESIGN WITH APPLICATION TO THE LAKE BALATON RESORT AREA [J].
KOVACS, LB ;
BOROS, E ;
INOTAY, F .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 23 (02) :169-178
[33]   An interval-parameter two-stage stochastic integer programming model for environmental systems planning under uncertainty [J].
Li, Y. P. ;
Huang, G. H. ;
Nie, S. L. ;
Nie, X. H. ;
Maqsood, I. .
ENGINEERING OPTIMIZATION, 2006, 38 (04) :461-483
[34]  
Loucks D., 1981, WATER RESOURCE SYSTE
[35]   A Physically Based Stochastic-Deterministic Procedure for the Estimation of Flood Frequency [J].
Loukas, Athanasios ;
Quick, Michael C. ;
Russell, Samuel O. .
WATER RESOURCES MANAGEMENT, 1996, 10 (06) :415-437
[36]   An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty [J].
Maqsood, M ;
Huang, GH ;
Yeomans, JS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) :208-225
[37]   OPTIMAL RESERVOIR CONTROL FOR HYDROPOWER ON COLORADO-RIVER, TEXAS [J].
MARTIN, QW .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1995, 121 (06) :438-446
[38]   Linear programming for flood control in the Iowa and Des Moines rivers [J].
Needham, JT ;
Watkins, DW ;
Lund, JR ;
Nanda, SK .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2000, 126 (03) :118-127
[39]   Dynamic models for floodplain management [J].
Olsen, JR ;
Beling, PA ;
Lambert, JH .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2000, 126 (03) :167-175
[40]   STOCHASTIC OPTIMIZATION OF A MULTIRESERVOIR HYDROELECTRIC SYSTEM - A DECOMPOSITION APPROACH [J].
PEREIRA, MVF ;
PINTO, LMVG .
WATER RESOURCES RESEARCH, 1985, 21 (06) :779-792