Time for development of internal erosion and piping in embankment dams

被引:247
作者
Fell, R [1 ]
Wan, CF
Cyganiewicz, J
Foster, M
机构
[1] Univ New S Wales, Sch Civil & Environm Engn, Sydney, NSW 2052, Australia
[2] US Bur Reclamat, Denver, CO 80215 USA
[3] URS Australia, Sydney, NSW 2060, Australia
关键词
pipes; erosion; dams; embankment; dam failure; monitoring;
D O I
10.1061/(ASCE)1090-0241(2003)129:4(307)
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A method is presented for the approximate estimation of the time for progression of internal erosion and piping, and development of a breach leading to failure in embankment dams and their. foundations. The method accounts for the nature of the soils in the dam core, the foundation, and the materials in the downstream zone of the dam. Guidance is also provided on the delectability of internal erosion and piping, taking account of the mechanism of initiation, continuation, and progression to form a breach, for internal erosion and piping in the embankment, the foundation and from the embankment to foundation. It is shown that in many dams which have poor internal erosion and seepage control and are constructed mainly of earthfill, the time for potential development of piping is short, and for these dams continuous monitoring of seepage or surveillance would be needed to detect the piping in time to: give warning of possible failure, and to give time to attempt intervention to prevent the failure.
引用
收藏
页码:307 / 314
页数:8
相关论文
共 14 条