Joint production and subcontracting planning of unreliable multi-facility multi-product production systems

被引:20
作者
Assid, M. [1 ]
Gharbi, A. [1 ]
Dhouib, K. [2 ]
机构
[1] Univ Quebec, Automated Prod Engn Dept, Ecole Technol Super, Prod Syst Design & Control Lab, Montreal, PQ H3C 1K3, Canada
[2] Univ Tunis, LMSSDT Lab, Mech Engn & Prod Dept, ENSIT, Tunis, Tunisia
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2015年 / 50卷
关键词
Production/subcontracting control; Pharmaceutical industry; Service level; Simulation modeling; Optimization; Response surface methodology; MANUFACTURING SYSTEM; PREVENTIVE MAINTENANCE; PROCESS DETERIORATION; POLICIES; MODEL;
D O I
10.1016/j.omega.2014.07.007
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This article addresses the problem of joint optimization of production and subcontracting of unreliable production systems. The production system considered presents a common problem in the pharmaceutical industry. It is composed of multiple production facilities with different capacities, each of which is capable of producing two different classes of medications (brand name and generic). The resort to subcontracting is double: first, it involves the quantity of products received on a regular basis in order to compensate for insufficient production capacity in existing facilities, second, when needed, urgent orders are also launched in order to reduce the risk of shortages caused by breakdowns of manufacturing facilities. Failures, repairs and urgent delivery times may be represented by any probability distributions. The objective is to propose a general control policy for the system under consideration, and to obtain, in the case of two facilities, optimal control parameters that minimize the total incurred cost for a specific level of the customer service provided. Given the complexity of the problem considered, an experimental optimization approach is chosen in order to determine the optimal control parameters. This approach includes experimental design, analysis of variance, response surface methodology and simulation modeling. It allows the accurate representation of the dynamic and stochastic behaviors of the production system and the assessment of optimal control parameters. Other control parameters which represent the subcontracting are introduced and three joint production/subcontracting control policies (general, urgent, regular) are compared to one another. The proposed joint production/regular subcontracting control policy involves a cost decrease of up to 20%, as compared to results obtained by Dror et al. [1], who used a simplified control policy in addition to a heuristic solution approach for a real case study. This policy offers not only cost savings, but is also easier to manage, as compared to that proposed by Dror et al. [1]. Numerical examples and a sensitivity analysis are also performed to illustrate the robustness of the proposed control policy and the solution approach. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 37 条
[1]   OPTIMAL-CONTROL OF PRODUCTION-RATE IN A FAILURE PRONE MANUFACTURING SYSTEM [J].
AKELLA, R ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1986, 31 (02) :116-126
[2]  
[Anonymous], 1996, Optimal Control: Basics and Beyond
[3]   Joint production and setup control policies: an extensive study addressing implementation issues via quantitative and qualitative criteria [J].
Assid, M. ;
Gharbi, A. ;
Hajji, A. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (5-8) :809-826
[4]   Joint optimisation of maintenance and production policies considering random demand and variable production rate [J].
Ayed, Souheil ;
Sofiene, Dellagi ;
Nidhal, Rezg .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (23) :6870-6885
[5]   Scheduling of an unreliable manufacturing system with nonresumable setups [J].
Bai, SX ;
Elhafsi, M .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (04) :909-925
[6]  
Banks Jerry, 2005, Discrete-event system simulation
[7]   Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell [J].
Berthaut, F. ;
Gharbi, A. ;
Dhouib, K. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (06) :642-654
[8]  
Booth R., 1996, Logistics Information Management, V9, P4, DOI 10.1108/09576059610116644
[9]   Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system [J].
Bouslah, Bassem ;
Gharbi, Ali ;
Pellerin, Robert .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) :143-156
[10]  
Caramanis M., 1991, International Journal of Flexible Manufacturing Systems, V3, P321, DOI 10.1007/BF00170212