Scheduling of an unreliable manufacturing system with nonresumable setups

被引:17
作者
Bai, SX
Elhafsi, M
机构
[1] UNIV CALIF RIVERSIDE,RIVERSIDE,CA 92521
[2] UNIV CALIF RIVERSIDE,A GARY ANDERSON GRAD SCH MANAGEMENT,RIVERSIDE,CA 92521
关键词
D O I
10.1016/S0360-8352(97)00020-X
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the scheduling of a manufacturing system with nonresumable setup changes. The system considered involves an unreliable machine that can produce two part types. The switchover from one part type to the other incurs a given constant setup time. The setups are nonresumable, i.e. after a machine repair completion, a setup decision has to be made. The parts have specified constant processing time and constant demand rate. We give a continuous dynamic programming formulation of the problem, which is solved numerically. The optimal setup switching policies are shown to be hedging corridors. Two heuristics, for the determination of the hedging levels, are provided. We show, through simulation, that the two heuristics exhibit good performance. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:909 / 925
页数:17
相关论文
共 21 条
[1]   PERFORMANCE OF HIERARCHICAL PRODUCTION SCHEDULING POLICY [J].
AKELLA, R ;
CHOONG, Y ;
GERSHWIN, SB .
IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1984, 7 (03) :225-240
[2]   OPTIMAL-CONTROL OF PRODUCTION-RATE IN A FAILURE PRONE MANUFACTURING SYSTEM [J].
AKELLA, R ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1986, 31 (02) :116-126
[3]  
Bai SX, 1996, OR SPEKTRUM, V18, P81, DOI 10.1007/BF01539732
[4]   Transient and steady-state analysis of a manufacturing system with setup changes [J].
Bai, SX ;
Elhafsi, M .
JOURNAL OF GLOBAL OPTIMIZATION, 1996, 8 (04) :349-378
[5]  
Bertsekas D. P., 1987, DYNAMIC PROGRAMMING
[6]  
CARAMANIS M, 1991, P 1991 NSF DES MAN S, P1191
[7]  
CONNOLLY S, 1992, LMP920005 MIT LAB MA
[8]   Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times [J].
Elhafsi, M ;
Bai, SX .
JOURNAL OF GLOBAL OPTIMIZATION, 1996, 9 (02) :183-216
[9]   Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution [J].
Elhafsi, M ;
Bai, SX .
MATHEMATICAL AND COMPUTER MODELLING, 1996, 24 (03) :57-78
[10]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598