Bounds and approximations for cycle times of a U-shaped production line

被引:18
作者
Nakade, K
Ohno, K
Shanthikumar, JG
机构
[1] Nagoya Inst Technol, Dept Syst Engn, Syowa Ku, Nagoya, Aichi 466, Japan
[2] Univ Calif Berkeley, Sch Business Adm, Berkeley, CA 94720 USA
关键词
U-shaped lines; cycle times; bounds; approximations; multi-function workers; JIT production systems;
D O I
10.1016/S0167-6377(97)00037-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we deal with a U-shaped production line with a single multi-function worker in a JIT production system. We assume that the processing times of items, operation times, and walking times of the worker between machines are sequences of mutually independent and generally distributed random variables. We derive upper and lower bounds for the expected cycle time of the line, and propose approximate formulae using these bounds. Numerical examples show that these approximations give less than two percent errors for the cases tested. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:191 / 200
页数:10
相关论文
共 6 条
[1]   THE U-LINE LINE BALANCING PROBLEM [J].
MILTENBURG, GJ ;
WIJNGAARD, J .
MANAGEMENT SCIENCE, 1994, 40 (10) :1378-1388
[2]  
Monden Y., 1993, TOYOTA PRODUCTION SY, V2nd
[3]   Reversibility and dependence in a U-shaped production line [J].
Nakade, K ;
Ohno, K .
QUEUEING SYSTEMS, 1995, 21 (1-2) :183-197
[4]  
NAKADE K, 1995, ANAL CYCLE TIMES U S
[5]   Analysis and optimization of a U-shaped production line [J].
Ohno, K ;
Nakade, K .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (01) :90-104
[6]  
SHAKED M., 1994, Stochastic Orders and Their Applications