Effects of random defective rate and imperfect rework process on economic production quantity model

被引:60
作者
Chiu, SW
Gong, DC
Wee, HM
机构
[1] Chaoyang Univ Technol, Dept Business Adm, Taichung 413, Taiwan
[2] Chung Yuan Christian Univ, Dept Ind Engn, Taoyuan 320, Taiwan
关键词
production; manufacturing; imperfect reworking; EPQ; production lot size;
D O I
10.1007/BF03167589
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper considers the economic production quantity (EPQ) model with a random defective rate and an imperfect rework process. The assumption of perfect quality production condition of the classical EPQ model is unrealistic. Due to process deterioration or other factors, production of defective items is inevitable. This study assumes that the defective rate is a random variable and all items produced are inspected. The imperfect quality items fall into two groups, the repairable and the scrap. The reworking of the repairable defective items starts when the regular production process finishes in each cycle. The rework process is also assumed to be imperfect, with a random scrap rate. Since the scrap items are produced during a production run, it follows that the production cycle length is not a constant. The renewal reward theorem is utilized to cope with the variable cycle length. A mathematical model is developed to minimize the overall costs and to derive the optimal lot size for the imperfect quality EPQ model where shortages are not permitted. A numerical example is provided to demonstrate its practical usage.
引用
收藏
页码:375 / 389
页数:15
相关论文
共 14 条
[1]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[2]   AN ECONOMIC ORDER QUANTITY MODEL WITH DEMAND-DEPENDENT UNIT PRODUCTION COST AND IMPERFECT PRODUCTION PROCESSES [J].
CHENG, TCE .
IIE TRANSACTIONS, 1991, 23 (01) :23-28
[3]   Bounds for production lot sizing with machine breakdowns [J].
Chung, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) :139-144
[4]   Production lot sizing with the reworking of imperfect quality items produced [J].
Hayek, PA ;
Salameh, MK .
PRODUCTION PLANNING & CONTROL, 2001, 12 (06) :584-590
[5]   SIMULTANEOUS DETERMINATION OF PRODUCTION CYCLE AND INSPECTION SCHEDULES IN A PRODUCTION SYSTEM [J].
LEE, HL ;
ROSENBLATT, MJ .
MANAGEMENT SCIENCE, 1987, 33 (09) :1125-1136
[6]  
Nahmias S., 2001, PRODUCTION OPERATION, V6
[7]  
Osteryoung J. S., 1986, Production and Inventory Management, V27, P39
[8]   ECONOMIC PRODUCTION CYCLES WITH IMPERFECT PRODUCTION PROCESSES [J].
ROSENBLATT, MJ ;
LEE, HL .
IIE TRANSACTIONS, 1986, 18 (01) :48-55
[9]   Economic production quantity model for items with imperfect quality [J].
Salameh, MK ;
Jaber, MY .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) :59-64
[10]  
Schwaller R. L., 1988, Prod. Inv. Man, V29, P22