共 22 条
[11]
Lenstra J.K., Rinnooy Kan A., New directions in scheduling theory, Operations Research Letters, 2, pp. 255-259, (1984)
[12]
Liesegang G., Schirmer A., Heuristische Verfahren zur Maschinenbelegungsplanung bei Reihenfertigung, Zeitschrift für Operations Research, 19, pp. 195-211, (1975)
[13]
Nawaz M., Enscore E.E., Ham I., A heuristic algorithm for the m-rnachine. N-job flow-shop sequencing problem, Omega, 11, pp. 91-95, (1983)
[14]
Palmer D.S., Sequencing jobs through a multi-stage process in the minimum total time-a quick method of obtaining a near optimum, Operational Research Quarterly, 16, pp. 101-107, (1965)
[15]
Papadimitriou C.H., Kanellakis P.C., Flowshop scheduling with limited temporary storage, Journal of the Association for Computing Machinery, 27, pp. 533-554, (1980)
[16]
Park Y.B., Pegden C.D., Enscore E.E., A survey and evaluation of static flowshop scheduling heuristics, International Journal of Production Research, 22, pp. 127-141, (1984)
[17]
Piehler J., Ein Beitrag zum Reihenfolgeproblem, Unternehmensforschung, 4, pp. 138-142, (1960)
[18]
Potts C.N., An adaptive branching rule for the permutation flow-shop problem, European Journal of Operational Research, 5, pp. 19-25, (1980)
[19]
Reddi S.S., Sequencing with finite intermediate storage, Management Science, 23, pp. 216-217, (1976)
[20]
Reddi S.S., Ramamoorthy C.Y., On the flow-shop sequencing problem with no wait in process, Operational Research Quarterly, 23, pp. 323-331, (1972)