AN ALGORITHM FOR NC TURRET PUNCH PRESS TOOL LOCATION AND HIT SEQUENCING

被引:29
作者
WALAS, RA [1 ]
ASKIN, RG [1 ]
机构
[1] UNIV IOWA,DIV SYST ENGN,IOWA CITY,IA 52242
关键词
D O I
10.1080/07408178408974695
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:280 / 287
页数:8
相关论文
共 21 条
[1]   A HEURISTIC ALGORITHM AND SIMULATION APPROACH TO RELATIVE LOCATION OF FACILITIES [J].
ARMOUR, GC ;
BUFFA, ES .
MANAGEMENT SCIENCE, 1963, 9 (02) :294-309
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]   A RESTRICTED LAGRANGEAN APPROACH TO THE TRAVELING SALESMAN PROBLEM [J].
BALAS, E ;
CHRISTOFIDES, N .
MATHEMATICAL PROGRAMMING, 1981, 21 (01) :19-46
[4]   APPLICATION OF DYNAMIC-PROGRAMMING TO OPTIMIZE TOOL REPLACEMENT SCHEDULES FOR MULTI-TOOL OPERATIONS INVOLVING DISTRIBUTED TOOL LIVES [J].
BAO, H .
JOURNAL OF MECHANICAL DESIGN-TRANSACTIONS OF THE ASME, 1980, 102 (03) :446-451
[5]   BENDERS PARTITIONING SCHEME APPLIED TO A NEW FORMULATION OF THE QUADRATIC ASSIGNMENT PROBLEM [J].
BAZARAA, MS ;
SHERALI, HD .
NAVAL RESEARCH LOGISTICS, 1980, 27 (01) :29-41
[6]   NUMERICAL INVESTIGATIONS ON QUADRATIC ASSIGNMENT PROBLEMS [J].
BURKARD, RE ;
STRATMANN, KH .
NAVAL RESEARCH LOGISTICS, 1978, 25 (01) :129-148
[7]  
CHRISTOFIDES N, 1979, COMBINATIONAL OPTIMI
[8]  
Christofides N., 1975, GRAPH THEORY ALGORIT
[9]  
Conway R, 1967, THEORY SCHEDULING
[10]  
Francis RL., 1974, FACILITY LAYOUT LOCA