MULTILEVEL PRODUCTION-INVENTORY CONTROL - MATERIAL REQUIREMENTS PLANNING OR REORDER POINT POLICIES

被引:25
作者
AXSATER, S [1 ]
ROSLING, K [1 ]
机构
[1] LINKOPING INST TECHNOL,DEPT PROD ECON,S-58183 LINKOPING,SWEDEN
关键词
REORDER POINT POLICIES; KANBAN; MRP; MULTIECHELON INVENTORIES;
D O I
10.1016/0377-2217(94)90084-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper compares Material Requirements Planning (MRP) with reorder point policies for multi-level inventory control. For general acyclical inventory systems it is demonstrated that MRP should be ranked at the top followed by installation stock (Q, r)-policies, Kanban-policies and finally order-up-to-S policies. For serial and assembly inventory systems also echelon stock (Q, r)-policies are included in the ranking list, between MRP and installation stock (Q, r)-policies. The results require that all policies apply the same review period. Otherwise they are quite general.
引用
收藏
页码:405 / 412
页数:8
相关论文
共 21 条
[21]   ESTIMATING THE PERFORMANCE OF MULTI-LEVEL INVENTORY SYSTEMS [J].
SVORONOS, A ;
ZIPKIN, P .
OPERATIONS RESEARCH, 1988, 36 (01) :57-72