共 21 条
MULTILEVEL PRODUCTION-INVENTORY CONTROL - MATERIAL REQUIREMENTS PLANNING OR REORDER POINT POLICIES
被引:25
作者:
AXSATER, S
[1
]
ROSLING, K
[1
]
机构:
[1] LINKOPING INST TECHNOL,DEPT PROD ECON,S-58183 LINKOPING,SWEDEN
关键词:
REORDER POINT POLICIES;
KANBAN;
MRP;
MULTIECHELON INVENTORIES;
D O I:
10.1016/0377-2217(94)90084-1
中图分类号:
C93 [管理学];
学科分类号:
12 ;
1201 ;
1202 ;
120202 ;
摘要:
This paper compares Material Requirements Planning (MRP) with reorder point policies for multi-level inventory control. For general acyclical inventory systems it is demonstrated that MRP should be ranked at the top followed by installation stock (Q, r)-policies, Kanban-policies and finally order-up-to-S policies. For serial and assembly inventory systems also echelon stock (Q, r)-policies are included in the ranking list, between MRP and installation stock (Q, r)-policies. The results require that all policies apply the same review period. Otherwise they are quite general.
引用
收藏
页码:405 / 412
页数:8
相关论文