共 44 条
- [21] Kuosla P.K., Mattikali R., Determining the assembly sequence from a 3-d model, Journal of Mechanical Working Technology, 20, pp. 153-162, (1989)
- [22] Ko H., Lee K., Automatic assembling procedure generation from mating conditions, Computer-Aided Design, 19, 1, pp. 3-10, (1937)
- [23] Kroll E., Lenz E., Wolberg J.R., Rule-based generation of exploded views and assembly sequences, Artificial Intelligence in Engineering Design, Analysis, and Manufacturing, 3, 3, pp. 143-155, (1989)
- [24] Latombe J.C., Mazer E., Lm: A high-level programming language for controlling assembly robots, Proceedings of the I Hh /SIR, pp. 683-690, (1981)
- [25] Lee K., Andrews G., Inference of the positions of components in an assembly: Part 2, Computer-Aided Design, 17, 1, pp. 20-24, (1985)
- [26] Lee K., Gossard D.C., A hierarchical data structure for representing assemblies: Part i, Computer-Aided Design, 17, 1, pp. 15-19, (1985)
- [27] Lee S., Backward assembly planning, Proceedings of the 3Rd International Conference on Tools for Artificial Intelligence, pp. 408-415, (1991)
- [28] Lieberman L.I., Wesley M.A., Autopass: An automatic programming system for computer controlled mechanical assembly, IBM Journal of Research & Development, pp. 321-333, (1977)
- [29] Lin A.C., Chang T.C., An integrated approach to automated assembly planning for three-dimensional mechanical products, International Journal of Production Research, 31, 5, pp. 1201-1227, (1993)
- [30] Lin A.C., Chang T.C., 3d maps: Three-dimensional mechanical assembly planning system, Journal of Manufacturing Systems, 12, 6, pp. 437-456, (1993)