A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects

被引:40
作者
Ameyaw, Ernest [1 ]
Chan, Albert [1 ]
Owusu-Manu, De-Graft [2 ]
Coleman, Ekow [3 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[2] Kwame Nkrumah Univ Sci & Technol, Dept Bldg Technol, Kumasi, Ghana
[3] Minist Finance & Econ Planning, Publ Invest Div, Accra, Ghana
关键词
Ghana; Construction projects; Contract sum; Final account; Cost overruns; Fuzzy synthetic evaluation;
D O I
10.1108/JFM-11-2013-0055
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to identify and then evaluate perceived risk factors influencing variability between contract sum and final count, and to develop a fuzzy risk assessment model for evaluating the overall impact of established critical risk factors impacting on variability between contract sum and final account in government-funded construction projects. Construction projects are characterised by risk factors that significantly impact on variability between the contract sum and final account. Design/methodology/approach - A research approach integrating questionnaire survey, mean scoring ranking and principal component factor analysis (PCFA) methods was adopted to evaluate and classify the critical risk factors. A fuzzy synthetic evaluation method was sequentially applied to compute the overall risk impact (ORI) of eight critical risk factors' impact on variability between contract sum and final account. Findings - Initial results showed that eight critical risk factors have high impact on variations between contract sum and final account, namely (in order): project funding problems, underestimation of quantities, variations by client, change in scope of works, inadequate specification, change in design by client, defects in design and unexpected site (ground) conditions. PCFA produced two factor solutions: "professional- related factors" and "client factors". The fuzzy model further showed that the ORI is 5.48, indicating that these risk factors have a high impact on variability between contract sum and final account in public construction projects. The client factors have a very high impact (5.59), while the professional-related factors indicated a high impact (5.41) on project cost variability. Originality/value - A practical model is proposed to evaluate the key risks associated with cost overruns in public projects. By giving effective and sustained attention to these factors, variability between contract sum and final account, a common situation in Ghana, can be controlled to achieve cost savings in public infrastructure projects.
引用
收藏
页码:45 / +
页数:26
相关论文
共 69 条
[1]  
Al-Hammad A., 1997, J QUAL MAINT ENG, V3, P29, DOI [10.1108/13552519710161526, DOI 10.1108/13552519710161526]
[2]  
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI DOI 10.1016/S0263-7863(98)00060-X
[3]   SYSTEMATIC-RISK MANAGEMENT APPROACH FOR CONSTRUCTION PROJECTS [J].
ALBAHAR, JF ;
CRANDALL, KC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (03) :533-546
[4]  
[Anonymous], 1988, STUDENTS PARTIAL SOL
[5]  
Arditi D., 1985, INT J PROJ MANAG, V3, P218, DOI DOI 10.1016/0263-7863(85)90053-5
[6]  
Badu Edward, 2011, Engineering Project Organization Journal, V1, P255, DOI 10.1080/21573727.2011.597744
[7]  
Chan A. P. C., 2000, INT J QUALITY RELIAB, V17, P423, DOI [DOI 10.1108/02656710010298445, 10.1108/02656710010298445]
[8]   The private sector's involvement in the water industry of Ghana [J].
Chan, Albert P. C. ;
Ameyaw, Ernest Effah .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2013, 11 (03) :251-275
[9]  
Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
[10]   Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction [J].
Chan, Joseph ;
Chan, Daniel ;
Chan, Albert ;
Lam, Patrick ;
Yeung, John .
JOURNAL OF FACILITIES MANAGEMENT, 2011, 9 (01) :34-+