Managing subcontractor supply chain for quality in construction

被引:57
作者
Karim, Khalid [1 ]
Marosszeky, Marton [1 ]
Davis, Steven [1 ]
机构
[1] Univ New South Wales, Sch Civil & Environm Engn, Sydney, NSW, Australia
关键词
Construction works; Pareto analysis; Subcontracting; Supply chain management; Decision support systems; Operations and production management;
D O I
10.1108/09699980610646485
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - To provide a decision support tool for long-term management of subcontractor supply chain for achieving better quality in construction. Design/methodology/approach - Defects on three construction projects are investigated through direct observation, document analysis, and interviews. A method to analyse and present defects information as an aid to decision making in relation to subcontractor supply chain management is proposed, and its application is illustrated by using the information obtained from the study. Findings - The importance of managing the subcontractor supply chain to reduce the incidence of defects is established. The nature and extent of the defects, along with what caused them, are discussed. Method for conversion of raw data into a decision support tool is presented. Research limitations/implications - The data collection method was limited in that it was not based on continuous full-time observation. Such presence by independent observers for full duration of the project would provide more accurate information. Practical implications - A useful tool for the construction industry in view of the fact that most of the construction work is now done by subcontractors and the head contractors primarily act as project managers. Originality/value - The concept of using Pareto analysis/histogram for managing quality has been around for a considerable period of time. This paper converts it into a more efficient and useful decision support tool.
引用
收藏
页码:27 / +
页数:19
相关论文
共 34 条
[1]  
Abdelhamid T. S., 2003, P 11 ANN C LEAN CONS, P65
[2]  
Abdul-Rahman H., 1999, INT J QUAL RELIAB MA, V16, P591, DOI DOI 10.1108/02656719910268198
[3]  
Atkinson A., 1999, STRUCT SURV J, V17, P231, DOI [10.1108/02630809910303006, DOI 10.1108/02630809910303006]
[4]  
AU JCW, 1999, LOGISTICS INFORM MAN, V12, P309
[5]  
BOSSINK BAG, 2002, INT J QUALITY RELIAB, V19, P170, DOI DOI 10.1108/02656710210413507
[6]   CAUSES OF QUALITY DEVIATIONS IN DESIGN AND CONSTRUCTION [J].
BURATI, JL ;
FARRINGTON, JJ ;
LEDBETTER, WB .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01) :34-49
[7]   'Submarines don't leak, why do buildings?' Building quality, technological impediment and organization of the building industry in Hong Kong [J].
Chiang, YH ;
Tang, BS .
HABITAT INTERNATIONAL, 2003, 27 (01) :1-17
[8]  
Commonwealth of Australia, 1999, BUILD GROWTH AN AUST
[9]  
Craft R.C., 2002, MANAGE DECIS, V40, P729, DOI [10.1108/00251740210437699, DOI 10.1108/00251740210437699]
[10]   Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong constructors [J].
Dissanayaka, SM ;
Kumaraswamy, MM ;
Karim, K ;
Marosszeky, M .
TOTAL QUALITY MANAGEMENT, 2001, 12 (01) :29-40