TASK ASSIGNMENT AND SUBASSEMBLY SCHEDULING IN FLEXIBLE ASSEMBLY LINES

被引:10
作者
AGNETIS, A
NICOLO, F
ARBIB, C
LUCERTINI, M
机构
[1] CTR VITO VOLTERRA RICERCA SCI,I-00133 ROME,ITALY
[2] UNIV LAQUILA,FAC SCI MATEMAT FIS & NAT,DIPARTIMENTO MATEMAT PURE & APPLICATA,I-67100 LAQUILA,ITALY
[3] UNIV ROMA TOR VERGATA,DIPARTIMENTO INGN ELETTR,I-00133 ROME,ITALY
来源
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION | 1995年 / 11卷 / 01期
关键词
D O I
10.1109/70.345934
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper deals with models for flow management problems in flexible assembly systems (FAS's). The system consists of a set of machines that must perform the assembly of a number of parts, possibly of different types. Each part type requires a set of operations; the precedence relations among the operations are specified by an assembly tree. Machines are provided with limited-capacity tool magazines and a finite buffer for holding parts. Each machine can be tooled to perform only a particular subset of the operations required by the whole process. One problem is that of finding a feasible assignment of operations to machines and a feasible schedule of the subassemblies in order to minimize the completion time of all of the parts. In this paper, the problem is analysed as a case of pipelined assembly, i.e., when the FAS is characterized by a serial transportation system (flow line) and there exists a dominating path in the assembly tree. Typically, this happens when there is a main pallet and all of the other components are assembled directly on it in a given sequence. We present polynomial-time dynamic programming algorithms for solving the problem for both single-type and multitype production. The approach is more general than typical ALB algorithms.
引用
收藏
页码:1 / 20
页数:20
相关论文
共 22 条
[11]  
French S., 1982, SEQUENCING SCHEDULIN
[12]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[13]   CONCURRENT ROUTING, SEQUENCING, AND SETUPS FOR A 2-MACHINE FLEXIBLE MANUFACTURING CELL [J].
LEE, EJ ;
MIRCHANDANI, PB .
IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1988, 4 (03) :256-264
[14]  
MCCORMICK ST, OPER RES, V37, P925
[15]  
MORIN TL, 1985, EUROPEAN J OP RES, V20, P68
[16]  
MORTON TE, 1984, 1ST P ORSA TIMS SPEC, P313
[17]  
ROBERTS S, 1970, AIIE T, V2
[18]  
SCHRIBER T, 1988, ANN OPERATIONS RES, V15
[20]   PERFORMANCE EVALUATION FOR SYSTEMS OF POOLED MACHINES OF UNEQUAL SIZES - UNBALANCING VERSUS BALANCING [J].
STECKE, KE ;
KIM, I .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 42 (01) :22-38