OPTIMAL MAINTENANCE - REPLACEMENT POLICY UNDER IMPERFECT MAINTENANCE

被引:25
作者
JAYABALAN, V [1 ]
CHAUDHURI, D [1 ]
机构
[1] INDIAN INST TECHNOL,DEPT HUMANITIES & SOCIAL SCI,DIV IND ENGN & MANAGEMENT,MADRAS 600036,TAMIL NADU,INDIA
关键词
D O I
10.1016/0951-8320(92)90096-4
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During a given planning period, in order to have the system working at or below a fixed failure rate, it may be necessary to replace the system to minimize the expected total cost. Preventive maintenance (PM) or replacement should be performed whenever the system reaches the maximum failure rate. This paper formulates a cost model and a branching algorithm to determine the number of PM interventions to be performed between each replacement and the number of such replacements during the planning period to minimize the expected total cost. Adjustment of the failure rate for the system degradation after each PM intervention and inflationary trends in cost factors are also incorporated. Numerical illustration and computational times have been presented.
引用
收藏
页码:165 / 169
页数:5
相关论文
共 13 条
[1]  
AYABALAN V, 1990, P NATIONAL SEMINAR Q, P21
[2]   COST OPTIMIZATION OF PERIODIC PREVENTIVE MAINTENANCE [J].
CANFIELD, RV .
IEEE TRANSACTIONS ON RELIABILITY, 1986, 35 (01) :78-81
[3]   2 CRITERIA FOR PREVENTIVE MAINTENANCE [J].
CHAN, PKW ;
DOWNS, T .
IEEE TRANSACTIONS ON RELIABILITY, 1978, 27 (04) :272-273
[4]   PREVENTIVE MAINTENANCE INTERVAL FOR OPTIMAL RELIABILITY OF DETERIORATING SYSTEM [J].
CHAUDHURI, D ;
SAHU, KC .
IEEE TRANSACTIONS ON RELIABILITY, 1977, 26 (05) :371-372
[6]  
JAYABAAN V, 1988, 4 P INT PLANT ENG C, P1
[7]  
JAYABALAN V, 1992, IEEE T RELIAB, V41
[8]   AN ALGORITHM FOR PREVENTIVE MAINTENANCE POLICY [J].
LIE, CH ;
CHUN, YH .
IEEE TRANSACTIONS ON RELIABILITY, 1986, 35 (01) :71-75
[9]   RELIABLE PREVENTIVE MAINTENANCE SCHEDULING [J].
MALIK, MAK .
AIIE TRANSACTIONS, 1979, 11 (03) :221-228
[10]   MEAN TIME TO FAILURE WITH PREVENTIVE MAINTENANCE [J].
NAKAGAWA, T .
IEEE TRANSACTIONS ON RELIABILITY, 1980, 29 (04) :341-341