SEQUENCING AND BATCHING PROCEDURES FOR MINIMIZING EARLINESS AND TARDINESS PENALTY OF ORDER RETRIEVALS

被引:55
作者
ELSAYED, EA
LEE, MK
KIM, S
SCHERER, E
机构
[1] Rutgers University, Department of Industrial Engineering, Keimyung University
[2] Rutgers University, Department of Mechanical Engineering, Aachen University of Technology
[3] Department of Industrial Engineering Rutgers, The State University of New Jersey, Piscataway, NJ
关键词
D O I
10.1080/00207549308956753
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Order retrieval is considered one of the most costly activities in automated warehouses. A recent survey, Warehousing Education and Research Council's 1986 Survey, identified order picking as the highest priority warehousing activity for productivity improvement. The recent implementations of the widely used just-in-time (JIT) approach to production control, which requires accurate order retrievals such that production delays and inventory accumulation between production stages are minimized, have further emphasized the importance of the order sequencing and batching problems. In this research, we investigate the multiple address automated storage/retrieval systems (AS/RS) when orders are assigned due dates. Orders to be retrieved arrive at the AS/R system and each order is defined by a set of products (parts) type, the corresponding quantities to be retrieved and a due date. Orders can be retrieved (processed) individually or grouped in batches and every batch is retrieved in one tour (trip) of the automated storage/retrieval machine. The grouping of orders into batches (batching process) is performed based on a penalty function which incorporates both the earliness and the tardiness of the orders. The objective is to sequence and group the orders into batches such that the penalty function is minimized. We develop efficient procedures for order sequencing and batching such that just-in-time order retrieval can be achieved.
引用
收藏
页码:727 / 738
页数:12
相关论文
共 32 条
[11]  
Elsayeo E.A., Order sequencing in automated storage/retrieval systems with due dates, Progress in Materials Handling and Logistics, pp. 244-267, (1991)
[12]  
Foley R.D., Frazelle E.H., Analytical results for miniload throughput and the distribution of dual command travel time, To Appear in IIE Transactions, (1991)
[13]  
Frazelle E.H., Stock Location Assignment and Order Picking Productivity, (1989)
[14]  
Fry T.D., Armstrong R.D., Blackstone J.H., Minimizing weighted absolute deviation in single machine scheduling, IIE Transactions, 19, pp. 445-450, (1987)
[15]  
Gibson D.R., Sharp G.P., Frazelle E.H., Data Preprocessing for Order Picking, (1990)
[16]  
Hall N.G., Kubiak W., Sethi S.P., Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date, Operations Research, 33, pp. 847-856, (1991)
[17]  
Han M.H., McGinnis L.F., Shieh J.S., White J.A., On sequencing retrievals in an automated storage/retrieval system, IIE Transactions, 19, 3, pp. 56-66, (1987)
[18]  
Ho J.C., Chang Y.-L., Heuristics for minimizing mean tardiness for m parallel machines, Naval Research Logistics, 38, pp. 367-381, (1991)
[19]  
Hwang H., Lee M.-K., Order batching algorithms for a man-on-board AS/RS, Engineering Cost and Production Economics, 13, pp. 285-294, (1988)
[20]  
Jaikumar R., Solomon M.M., Dynamic operational policies in an automated warehouse, IIE Transactions, 22, 4, pp. 370-376, (1990)