SYSTEMATIC-RISK MANAGEMENT APPROACH FOR CONSTRUCTION PROJECTS

被引:189
作者
ALBAHAR, JF
CRANDALL, KC
机构
[1] Dept. of Civ. Engrg., Coll. of Engrg. and Petroleum, Kuwait Univ., Safat, 13060
[2] Dept. of Civ. Engrg., Univ. of California, Berkeley, CA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1990年 / 116卷 / 03期
关键词
D O I
10.1061/(ASCE)0733-9364(1990)116:3(533)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk is inherently present in all construction projects. Quite often, construction projects fail to achieve their time, quality, and budget goals. A risk model entitled construction risk management system (CRMS) is introduced to help contractors identify project risks and systematically to analyze and manage them. The CRMS model is a logical substitute for the traditional intuitive unsystematic approach currently used by most contractors. The influence diagramming technique and Monte Carlo simulation are used as tools to analyze and evaluate project risks. Alternative risk management strategies are suggested. Such strategies include: risk avoidance, risk transfer, risk retention, loss reduction, and risk prevention and insurance. © ASCE.
引用
收藏
页码:533 / 546
页数:14
相关论文
共 27 条
  • [11] Faber W., Protecting Giant Projects: A Study of Problems and Solutions in the Area of Risk and Insurance, (1979)
  • [12] Fraser D.C., Risk Minimization in Giant Projects, (1978)
  • [13] Greene M.R., Trieschmann J.S., Risk and Insurance, (1984)
  • [14] Healy N.J., Risk Management in Giant Civil Engineering Projects, (1981)
  • [15] Hertz D.B., Thomas H., Risk Analysis and Its Applications, (1983)
  • [16] Howard R.H., Matheson J.E., Influence Diagrams.Readings on the Principles and Applications of Decision Analysis, (1984)
  • [17] Huber G.P., Method of quantifying probabilities and multivariate utilities, Decision Science, 5, (1974)
  • [18] Johnson J., Rood O.E., Elements of a fair and equitable profit-determination for construction contract negotiations, Draft Report, (1977)
  • [19] Lifson M.W., Shaifer E.F., Decision and Risk Analysis for Construction Management, (1982)
  • [20] Mason G.E., A quantitative risk management approach to selection of construction contract provisions, Technical Report No. 173, (1973)