共 23 条
[1]
EXPECTED ENERGY-PRODUCTION COST OF 2 INTERCONNECTED SYSTEMS WITH CORRELATED DEMANDS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1983, 102 (07)
:2155-2164
[2]
Baleriaux H., 1967, REVUE, V5, P3
[3]
LONG-RANGE GENERATION PLANNING USING DECOMPOSITION AND PROBABILISTIC SIMULATION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1982, 101 (04)
:797-802
[4]
LONG-RANGE GENERATION PLANNING WITH LIMITED ENERGY AND STORAGE PLANTS .1. PRODUCTION COSTING
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1983, 102 (09)
:2861-2870
[5]
POWER-SYSTEM SIMULATION MODEL BASED ON PROBABILITY ANALYSIS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1972, PA91 (01)
:62-&
[6]
ANALYSIS OF NON-DISPATCHABLE OPTIONS IN THE GENERATION EXPANSION PLAN
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1983, 102 (07)
:2098-2103
[7]
THE INTRODUCTION OF NON-DISPATCHABLE TECHNOLOGIES AS DECISION VARIABLES IN LONG-TERM GENERATION EXPANSION MODELS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1982, 101 (08)
:2658-2667
[8]
FEGAN GR, WIN IEEE POW M
[9]
HEYDT GT, 1983, COMMUNICATION
[10]
HOEL PG, 1962, INTRO MATH STATISTIC