MINIMIZING THE MAKESPAN IN THE 3-MACHINE ASSEMBLY-TYPE FLOWSHOP SCHEDULING PROBLEM

被引:246
作者
LEE, CY
CHENG, TCE
LIN, BMT
机构
[1] HONG KONG POLYTECH,DEPT MANAGEMENT,KOWLOON,HONG KONG
[2] NATL CHAIO TUNG UNIV,DEPT COMP & INFORMAT SCI,HSINCHU 30050,TAIWAN
关键词
FLOWSHOP; SCHEDULING; ASSEMBLY-TYPE PRODUCTION;
D O I
10.1287/mnsc.39.5.616
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.
引用
收藏
页码:616 / 625
页数:10
相关论文
共 23 条
[1]   NOTE ON A PAPER BY SZWARC,W [J].
ARTHANARY, TS ;
MUKHOPAD.AC .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1971, 18 (01) :135-+
[2]  
Ashour S., 1970, AIIE T, V2, P172
[3]  
ASHOUR S, 1970, OPER RES, V12, P541
[4]   COMPARATIVE STUDY OF FLOW-SHOP ALGORITHMS [J].
BAKER, KR .
OPERATIONS RESEARCH, 1975, 23 (01) :62-73
[5]   JOHNSONS 3-MACHINE FLOW-SHOP CONJECTURE [J].
BURNS, F ;
ROOKER, J .
OPERATIONS RESEARCH, 1976, 24 (03) :578-580
[6]   SPECIAL CASE OF 3XN FLOW SHOP PROBLEM [J].
BURNS, F ;
ROOKER, J .
NAVAL RESEARCH LOGISTICS, 1975, 22 (04) :811-817
[7]   A NOTE ON THE EQUIVALENCE OF THE WILKERSON-IRWIN AND MODIFIED DUE-DATE RULES FOR THE MEAN TARDINESS SEQUENCING PROBLEM [J].
CHENG, TCE .
COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 22 (01) :63-66
[8]  
Conway R, 1967, THEORY SCHEDULING
[9]  
DUDEK RA, 1991 ORSA TIMS M NAS
[10]  
French S., 1982, SEQUENCING SCHEDULIN