A BRANCH-AND-BOUND APPROACH TO THE BICRITERION SCHEDULING PROBLEM INVOLVING TOTAL FLOWTIME AND RANGE OF LATENESS

被引:28
作者
SEN, T
RAISZADEH, FME
DILEEPAN, P
机构
关键词
D O I
10.1287/mnsc.34.2.254
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:254 / 260
页数:7
相关论文
共 12 条
[1]   SCHEDULING TO MINIMIZE WEIGHTED SUM OF COMPLETION TIMES WITH SECONDARY CRITERIA [J].
BURNS, RN .
NAVAL RESEARCH LOGISTICS, 1976, 23 (01) :125-129
[2]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[3]   NOTE ON A SCHEDULING PROBLEM WITH DUAL CRITERIA [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :615-616
[4]   DUAL ALGORITHM FOR ONE-MACHINE SCHEDULING PROBLEM [J].
FISHER, ML .
MATHEMATICAL PROGRAMMING, 1976, 11 (03) :229-251
[5]   MINIMIZING THE RANGE OF LATENESS ON A SINGLE-MACHINE [J].
GUPTA, S ;
SEN, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1984, 35 (09) :853-857
[6]   EXTENSION OF A RESULT ON SCHEDULING WITH SECONDARY CRITERIA [J].
HECK, H ;
ROBERTS, S .
NAVAL RESEARCH LOGISTICS, 1972, 19 (02) :403-405
[7]  
PANWALKAR SS, 1973, S THEORY SCHEDULING
[8]   A BRANCH-AND-BOUND PROCEDURE TO SOLVE A BICRITERION SCHEDULING PROBLEM [J].
SEN, T ;
GUPTA, SK .
IIE TRANSACTIONS, 1983, 15 (01) :84-88
[9]  
Smith W.E., 1956, NAV RES LOGIST Q, V3, P59, DOI DOI 10.1002/NAV.3800030106