STAGE APPROACH FOR EVALUATION AND SELECTION OF R AND D PROJECTS

被引:27
作者
ALBALA, A
机构
[1] TECHNION ISRAEL INST TECHNOL,SCH IND & MANAGEMENT ENGN,HAIFA,ISRAEL
[2] UNIV TEL AVIV,TEL AVIV,ISRAEL
关键词
D O I
10.1109/TEM.1975.6447232
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:153 / 163
页数:11
相关论文
共 67 条
  • [51] RUBENSTEIN AH, 1957, HARVARD BUSINESS JAN, P95
  • [52] RUBENSTEIN AH, 1969, IEEE T ENGINEERING M, VEM16, P1
  • [53] SANDRETTO CP, 1968, ECONOMIC MANAGEMENT, P71
  • [54] SEILER RE, 1965, IMPROVING EFFECTIVEN, P137
  • [55] Souder W. E., 1974, R & D Management, V4, P75, DOI 10.1111/j.1467-9310.1974.tb01057.x
  • [56] Souder W. E., 1972, R & D Management, V3, P13, DOI 10.1111/j.1467-9310.1972.tb00991.x
  • [57] SOUDER WE, 1967, CHEM ENG PROG, V63, P27
  • [58] UTILITY AND PERCEIVED ACCEPTABILITY OF R AND D PROJECT SELECTION MODELS
    SOUDER, WE
    [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1973, 19 (12): : 1384 - 1394
  • [59] SPITZ PH, 1966, CHEMICAL PLANT FROM, P27
  • [60] STEINER GA, 1969, TOP MANAGEMENT PLANN, P555