OPTIMAL TIMING, SEQUENCING, AND SIZING OF MULTIPLE RESERVOIR SURFACE WATER SUPPLY FACILITIES - COMMENT

被引:5
作者
ERLENKOTTER, D [1 ]
机构
[1] UNIV CALIF,GRAD SCH MANAGEMENT,LOS ANGELES,CA 90024
关键词
D O I
10.1029/WR011i002p00380
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
引用
收藏
页码:380 / 381
页数:2
相关论文
共 5 条
[1]   OPTIMAL TIMING, SEQUENCING, AND SIZING OF MULTIPLE RESERVOIR SURFACE WATER SUPPLY FACILITIES [J].
BECKER, L ;
YEH, WWG .
WATER RESOURCES RESEARCH, 1974, 10 (01) :57-62
[2]   DYNAMIC PROGRAMING FOR OPTIMAL SEQUENCING OF WATER SUPPLY PROJECTS [J].
BUTCHER, WS ;
HAIMES, YY ;
HALL, WA .
WATER RESOURCES RESEARCH, 1969, 5 (06) :1196-&
[3]   SEQUENCING OF INTERDEPENDENT HYDROELECTRIC PROJECTS [J].
ERLENKOTTER, D .
WATER RESOURCES RESEARCH, 1973, 9 (01) :21-27
[4]   SEQUENCING EXPANSION PROJECTS [J].
ERLENKOTTER, D .
OPERATIONS RESEARCH, 1973, 21 (02) :542-553
[5]   SOME EFFICIENT DYNAMIC PROGRAMING ALGORITHMS FOR OPTIMAL SEQUENCING AND SCHEDULING WATER SUPPLY PROJECTS [J].
MORIN, TL ;
ESOGBUE, AMO .
WATER RESOURCES RESEARCH, 1971, 7 (03) :479-&