THE 2-MACHINE SEQUENCE DEPENDENT FLOWSHOP SCHEDULING PROBLEM

被引:95
作者
GUPTA, JND [1 ]
DARROW, WP [1 ]
机构
[1] TOWSON STATE UNIV,TOWSON,MD 21204
关键词
FLOWSHOP - HEURISTIC - NP-COMPLETE - TWO-MACHINE SEQUENCE;
D O I
10.1016/0377-2217(86)90037-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:439 / 446
页数:8
相关论文
共 11 条
[1]  
Bellman R., 1982, MATH ASPECTS SCHEDUL
[2]   2 MACHINE FLOW SHOP SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES - DYNAMIC-PROGRAMMING APPROACH [J].
CORWIN, BD ;
ESOGBUE, AO .
NAVAL RESEARCH LOGISTICS, 1974, 21 (03) :515-524
[3]  
DARROW WP, 1980, THESIS PENNSYLVANIA
[4]  
French S., 1982, SEQUENCING SCHEDULIN
[5]  
Garey Michael R., 1979, COMPUTERS INTRACTABI
[6]  
Gupta J. N. D., 1975, Computers & Operations Research, V2, P83, DOI 10.1016/0305-0548(75)90011-8
[7]  
GUPTA JND, 1985, INDIAN J MANAGEMENT, V1, P6
[8]  
Gupta JND, 1979, DISAGGREGATION PROBL
[9]  
Johnson S. M., 1954, NAV RES LOGIST Q, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[10]   HEURISTIC PROGRAMMING SOLUTION OF A FLOWSHOP-SCHEDULING PROBLEM [J].
KRONE, MJ ;
STEIGLIT.K .
OPERATIONS RESEARCH, 1974, 22 (03) :629-638