A 0-1 GOAL PROGRAMMING-MODEL FOR SCHEDULING MULTIPLE MAINTENANCE PROJECTS AT A COPPER MINE

被引:20
作者
CHEN, VYX
机构
基金
加拿大自然科学与工程研究理事会;
关键词
0-1 GOAL PROGRAMMING; MULTI-PROJECT SCHEDULING; LIMITED RESOURCES; MINING INDUSTRY;
D O I
10.1016/0377-2217(94)90015-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper describes the application of 0-1 goal programming (GP) in multi-project resource-constrained scheduling for the maintenance of mineral-processing equipment at a copper mine in China. This involves four projects, 40 jobs and nine types of resources. We first develop a generalized 0-1 GP model. Because of the limited computing capacity at the mine, an effective two-phase hybrid solution approach is then proposed. In Phase I, under resource constraints, a feasible schedule is obtained by a heuristic. Based on this feasible schedule and a model-simplification procedure, many decision variables in the generalized model are eliminated and redundant constraints are removed. (Although this procedure is particularly designed for this mine, we also discuss its extension to general problems.) In Phase II, the streamlined model is solved by implicit enumeration. This approach eliminates 90% of the variables and 96% of the constraints in the problem we studied. We are thus able to solve a multi-project scheduling problem of medium size on a PC. In comparison with the heuristic method that the mine was using, our hybrid approach reduced project duration by 13%, total project cost by 30%, cost for the critical project by 15%, and overall workload by 59%.
引用
收藏
页码:176 / 191
页数:16
相关论文
共 23 条
[1]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[2]  
CHEN VYX, 1985, THESIS CENTRAL S U T
[3]  
Davis E. W., 1973, AIIE T, V5, P297
[4]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[5]   APPLICATION OF GOAL PROGRAMMING TECHNIQUES TO CPM PROBLEM [J].
HANNAN, EL .
SOCIO-ECONOMIC PLANNING SCIENCES, 1978, 12 (05) :267-270
[6]   RESOURCE-CONSTRAINED PROJECT SCHEDULING - STATE OF ART [J].
HERROELEN, WS .
OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) :261-+
[7]  
Ignizio J.P., 1976, GOAL PROGRAMMING EXT, V2nd
[8]  
KELLEY JE, 1963, IND SCHEDULING, P347
[9]   MULTI-PROJECT SCHEDULING - CATEGORIZATION OF HEURISTIC RULES PERFORMANCE [J].
KURTULUS, I ;
DAVIS, EW .
MANAGEMENT SCIENCE, 1982, 28 (02) :161-172
[10]   MULTI-PROJECT SCHEDULING - ANALYSIS OF PROJECT PERFORMANCE [J].
KURTULUS, IS ;
NARULA, SC .
IIE TRANSACTIONS, 1985, 17 (01) :58-66