SEMIACTIVE, ACTIVE, AND NON-DELAY SCHEDULES FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

被引:138
作者
SPRECHER, A
KOLISCH, R
DREXL, A
机构
[1] Institut für Betriebswirtschaftslehre, Christian-Albrechts-Universität zu Kiel, 24118 Kiel
关键词
RESOURCE-CONSTRAINED PROJECT SCHEDULING; SEMIACTIVE; ACTIVE; AND NON-DELAY SCHEDULES; BRANCH-AND-BOUND METHODS;
D O I
10.1016/0377-2217(93)E0294-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the resource-constrained project scheduling problem (RCPSP). The focus of the paper is on a formal definition of semi-active, active, and non-delay schedules. Traditionally these schedules establish basic concepts within the job shop scheduling literature. There they are usually defined in a rather informal way which does not create any substantial problems. Using these concepts in the more general RCPSP without giving a formal definition may cause serious problems. After providing a formal definition of semi-active, active, and non-delay schedules for the RCPSP we outline some of these problems occurring within the disjunctive are concept.
引用
收藏
页码:94 / 102
页数:9
相关论文
共 33 条
[1]  
ALVAREZVALDES R, 1989, ADV PROJECT SCHEDULI, P113
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[4]  
Bartusch M., 1988, Annals of Operations Research, V16, P201
[5]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[6]  
2-7
[7]  
BELL CE, 1990, NAV RES LOG, V37, P61, DOI 10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO
[8]  
2-S
[9]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[10]  
Conway R, 1967, THEORY SCHEDULING