Delays and cost increases in the construction of private residential projects in Kuwait

被引:210
作者
Koushki, P. A. [1 ]
Al-Rashid, K. [1 ]
Kartam, N. [1 ]
机构
[1] Kuwait Univ, Dept Civil Engn, POB 5969, Safat 13060, Kuwait
关键词
Delay; cost increase; residential projects; Kuwait;
D O I
10.1080/0144619042000326710
中图分类号
F [经济];
学科分类号
02 ;
摘要
Time-delays and cost-increases associated with the construction of private residential projects in the State of Kuwait are determined. A person-interview survey of 450 randomly selected private residential project owners and developers in 27 representative districts in metropolitan Kuwait formed the database for the study. The socio-economic traits of the owners/developers, and the pre-construction family planning, the design, and the construction phases of the sample projects are presented. Estimates of time-delays and cost-increases are made, and their causes identified. The three main causes of time-delays included changing orders, owners' financial constraints and owners' lack of experience in the construction business. Regarding cost overruns, the three main causes were identified as contractor-related problems, material-related problems and, again, owners' financial constraints. A number of recommendations end the paper. The minimization of time delays and cost overruns in private residential projects would require: the availability of adequate funds, allocation of sufficient time and money at the design phase, and selection of a competent consultant and a reliable contractor to carry out the work.
引用
收藏
页码:285 / 294
页数:10
相关论文
共 16 条
[1]  
Aibinu A.A., 2002, INT J PROJ MANAG, V20, P593
[2]  
ALHAMMAD A, 1993, BUILD RES INF, V21, P269
[3]  
Arditi D., 1985, CONSTR MANAG EC, V3, P171, DOI DOI 10.1080/01446198500000013
[4]   CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS [J].
ASSAF, SA ;
ALKHALIL, M ;
ALHAZMI, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) :45-50
[5]  
Chan D.W., 2002, INT J PROJ MANAG, V20, P23, DOI [10.1016/S0263-7863(00)00032-6, DOI 10.1016/S0263-7863(00)00032-6]
[6]   Forecasting construction durations for public housing projects: a Hong Kong perspective [J].
Chan, DWM ;
Kumaraswamy, MM .
BUILDING AND ENVIRONMENT, 1999, 34 (05) :633-646
[7]  
Hafez N., 2001, PRIVATE RESIDENTIAL
[8]  
Hensey M., 1993, J MGMT ENG ASCE, V9, P329
[9]  
Morris P, 1989, ANATOMY MAJOR PROJEC
[10]  
Ogunlana S.O., 1996, INT J PROJ MANAG, V14, P37, DOI DOI 10.1016/0263-7863(95)00052-6