LEARNING-BASED SCHEDULING IN A FLEXIBLE MANUFACTURING FLOW LINE

被引:42
作者
PIRAMUTHU, S
RAMAN, N
SHAW, MJ
机构
[1] UNIV ILLINOIS,DEPT BUSINESS ADM,CHAMPAIGN,IL 61820
[2] UNIV ILLINOIS,BECKMAN INST,CHAMPAIGN,IL 61820
关键词
SCHEDULING; FLEXIBLE FLOW SYSTEMS; MACHINE LEARNING;
D O I
10.1109/17.293384
中图分类号
F [经济];
学科分类号
02 ;
摘要
We develop a bilevel framework for scheduling a circuit board (PCB) assembly plant which uses surface mount technology for inserting electronic components. Machine learning techniques are utilized for developing a system that adaptively utilizes the most appropriate heuristics given the current state of the system. We consider heuristics for both part-release and dispatching at machines. The results demonstrate the effectiveness of our approach compared to some other existing heuristic scheduling approaches.
引用
收藏
页码:172 / 182
页数:11
相关论文
共 36 条
[1]  
Ahmadi J. H., 1988, Annals of Operations Research, V15, P269, DOI 10.1007/BF02186799
[2]   PERFORMANCE OF HIERARCHICAL PRODUCTION SCHEDULING POLICY [J].
AKELLA, R ;
CHOONG, Y ;
GERSHWIN, SB .
IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1984, 7 (03) :225-240
[3]  
Baker K.R., 1982, J OPER MANAGE, V3, P37
[4]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[5]   OPTIMAL OPERATING RULES FOR AUTOMATED MANUFACTURING SYSTEMS [J].
BUZACOTT, JA .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1982, 27 (01) :80-86
[6]  
Conway R, 1967, THEORY SCHEDULING
[7]  
ERSCHLER J, 1984, PRIODIC RELEASE STRA
[8]  
GINSBERG A, 1988, AUTOMATIC REFINEMENT
[9]   CLOSED-LOOP JOB RELEASE CONTROL FOR VLSI CIRCUIT MANUFACTURING [J].
GLASSEY, CR ;
RESENDE, MGC .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1988, 1 (01) :36-46
[10]   A SCHEDULING RULE FOR JOB RELEASE IN SEMICONDUCTOR FABRICATION [J].
GLASSEY, CR ;
RESENDE, MGC .
OPERATIONS RESEARCH LETTERS, 1988, 7 (05) :213-217