THE U-LINE LINE BALANCING PROBLEM

被引:202
作者
MILTENBURG, GJ [1 ]
WIJNGAARD, J [1 ]
机构
[1] EINDHOVEN UNIV TECHNOL,5600 MB EINDHOVEN,NETHERLANDS
关键词
Line balancing problem - Task precedence network - U line;
D O I
10.1287/mnsc.40.10.1378
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The traditional line balancing (LB) problem considers a production line in which stations are arranged consecutively in a line. A balance is determined by grouping tasks into stations while moving forward (or backward) through a precedence network. Recently many production lines are being arranged in a ''U-line,'' as a consequence of the use of just-in-time production principles in many factories. In this paper the U-line LB problem is introduced and modelled, and solution procedures are developed. It is more complex than the traditional LB problem because tasks can be grouped by moving forward, backward, or simultaneously in both directions, through the precedence network. We also show how solution techniques developed for the traditional LB problem can be adapted for use with the new problem. Some computational results for well-known problems from the literature are given.
引用
收藏
页码:1378 / 1388
页数:11
相关论文
共 17 条
[11]   A REVIEW OF ANALYTICAL SYSTEMS OF LINE BALANCING [J].
KILBRIDGE, MD ;
WESTER, L .
OPERATIONS RESEARCH, 1962, 10 (05) :626-638
[12]   EXPERIMENTAL INVESTIGATION AND COMPARATIVE EVALUATION OF PRODUCTION LINE BALANCING TECHNIQUES [J].
MASTOR, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (11) :728-746
[13]   LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J .
MANAGEMENT SCIENCE, 1989, 35 (02) :192-207
[14]  
Monden Y., 1993, TOYOTA PRODUCTION SY
[15]   DYNAMIC-PROGRAMMING SOLUTION OF SEQUENCING PROBLEMS WITH PRECEDENCE CONSTRAINTS [J].
SCHRAGE, L ;
BAKER, KR .
OPERATIONS RESEARCH, 1978, 26 (03) :444-449
[16]   A COMPARATIVE-EVALUATION OF HEURISTIC LINE BALANCING TECHNIQUES [J].
TALBOT, FB ;
PATTERSON, JH ;
GEHRLEIN, WV .
MANAGEMENT SCIENCE, 1986, 32 (04) :430-454
[17]  
Wantuck, 1989, JUST TIME AM