共 36 条
[11]
CONWAY RW, 1965, J IND ENGINEERING, V16, P123
[12]
EILON S, 1968, INT J PROD RES, V7, P135, DOI DOI 10.1080/00207546808929803
[13]
Eilon S, 1967, INT J PROD RES, V6, P1
[14]
FABRYCKY WJ, 1966, J IND ENGINEERING, V17, P308
[15]
LABOR FLEXIBILITY IN MULTIECHELON DUAL-CONSTRAINT JOB SHOPS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 20 (07)
:1073-1080
[16]
OPERATING POLICIES IN MULTIECHELON DUALCONSTRAINT JOB SHOPS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 19 (09)
:1001-1012
[17]
GAVETT JW, 1965, MANAGE SCI, V11, pB166
[18]
Gere S.William., 1966, MANAGE SCI, V13, P167
[19]
EFFECTIVENESS OF 3 HEURISTIC RULES FOR JOB SEQUENCING IN A SINGLE PRODUCTION FACILITY
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 19 (05)
:575-580