GOAL PROGRAMMING-MODEL SUBSYSTEM OF A FLEXIBLE NURSE SCHEDULING SUPPORT SYSTEM

被引:60
作者
OZKARAHAN, I [1 ]
BAILEY, JE [1 ]
机构
[1] ARIZONA STATE UNIV,IND & MANAGEMENT SYST ENGN,TEMPE,AZ 85287
关键词
D O I
10.1080/07408178808966185
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:306 / 316
页数:11
相关论文
共 9 条
[1]   INTEGRATED DAYS OFF AND SHIFT PERSONNEL SCHEDULING [J].
BAILEY, J .
COMPUTERS & INDUSTRIAL ENGINEERING, 1985, 9 (04) :395-404
[2]  
BAKER KR, 1985, OPS RE, V5, P327
[3]  
Dantzig G, 1954, OPER RES, V2, P339, DOI [10.1287/opre.2.3.339, DOI 10.1287/OPRE.2.3.339]
[4]  
Lee S.M., 1972, GOAL PROGRAMMING DEC, V1st
[5]  
LEE SM, 1979, PUB AIIE INC, V2
[6]  
OZKARAHAN I, 1987, P IEEE SCAMC S COMPU
[7]  
OZKARAHAN I, 1986, OCT TIMS ORSA JOINT
[8]  
OZKARAHAN I, 1987, THESIS ARIZONA STATE
[9]  
OZKARAHAN I, 1987, HIST APPROACHES NURS