MULTIOBJECTIVE ENERGY GENERATION PLANNING UNDER UNCERTAINTY

被引:11
作者
EVANS, GW
MORIN, TL
MOSKOWITZ, H
机构
[1] PURDUE UNIV,SCH IND ENGN,W LAFAYETTE,IN 47907
[2] PURDUE UNIV,KRANNERT GRAD SCH MANAGEMENT,W LAFAYETTE,IN 47907
关键词
D O I
10.1080/05695558208974602
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:183 / 192
页数:10
相关论文
共 50 条
[1]   MODELS FOR DETERMINING LEAST-COST INVESTMENTS IN ELECTRICITY SUPPLY [J].
ANDERSON, D .
BELL JOURNAL OF ECONOMICS AND MANAGEMENT SCIENCE, 1972, 3 (01) :267-299
[2]  
[Anonymous], 2012, DYNAMIC PROGRAMMING
[3]  
AVERCH H, 1962, AM ECON REV, V52, P1052
[4]   OPTIMAL GENERATION PLANNING CONSIDERING UNCERTAINTY [J].
BOOTH, RR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (01) :70-&
[5]   POWER-SYSTEM SIMULATION MODEL BASED ON PROBABILITY ANALYSIS [J].
BOOTH, RR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (01) :62-&
[6]   DYNAMIC PROGRAMMING IN MULTIPLICATIVE LATTICES [J].
BROWN, TA ;
STRAUCH, RE .
JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 1965, 12 (02) :364-&
[7]   DYNAMIC-PROGRAMMING APPROACH TO SELECTION AND TIMING OF GENERATION-PLANT ADDITIONS [J].
DALE, KM .
PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1966, 113 (05) :803-&
[8]  
DEKLUYVER CA, 1981, 765 PURD U I RES BEH
[9]   SHORTEST-ROUTE METHODS .1. REACHING, PRUNING, AND BUCKETS [J].
DENARDO, EV ;
FOX, BL .
OPERATIONS RESEARCH, 1979, 27 (01) :161-186
[10]  
DUSONCHET YP, 1972, THESIS PURDUE U