MULTIOBJECTIVE ENERGY GENERATION PLANNING UNDER UNCERTAINTY

被引:11
作者
EVANS, GW
MORIN, TL
MOSKOWITZ, H
机构
[1] PURDUE UNIV,SCH IND ENGN,W LAFAYETTE,IN 47907
[2] PURDUE UNIV,KRANNERT GRAD SCH MANAGEMENT,W LAFAYETTE,IN 47907
关键词
D O I
10.1080/05695558208974602
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:183 / 192
页数:10
相关论文
共 50 条
[41]  
PROVENZANO G, 1976, SPR JOINT NAT ORSA T
[42]  
ROGERS JS, 1974, JAN POW ENG SOC WINT
[43]   SEQUENTIAL APPROACH TO CROSS-IMPACT ANALYSIS [J].
SARIN, RK .
FUTURES, 1978, 10 (01) :53-62
[44]   ELECTRIC-POWER SYSTEM-PLANNING WITH EXPLICIT STOCHASTIC RESERVES CONSTRAINT [J].
SCHERER, CR ;
JOE, L .
MANAGEMENT SCIENCE, 1977, 23 (09) :978-985
[45]   ANALYSIS OF A PREFERENCE ORDER TRAVELING SALESMAN PROBLEM [J].
SNIEDOVICH, M .
OPERATIONS RESEARCH, 1981, 29 (06) :1234-1237
[46]   ANALYSIS OF A PREFERENCE ORDER ASSEMBLY LINE PROBLEM [J].
SNIEDOVICH, M .
MANAGEMENT SCIENCE, 1981, 27 (09) :1067-1080
[47]  
TELSON ML, 1973, EC RELIABILITY ELECT
[48]   MULTICRITERIA INTEGER PROGRAMMING - A (HYBRID) DYNAMIC-PROGRAMMING RECURSIVE APPROACH [J].
VILLARREAL, B ;
KARWAN, MH .
MATHEMATICAL PROGRAMMING, 1981, 21 (02) :204-223
[49]  
1976, ADEQUACY FUTURE ELEC
[50]  
1981, ELECTRICAL WORLD, V195