PARALLEL MACHINE SCHEDULING TO MINIMIZE COSTS FOR EARLINESS AND NUMBER OF TARDY JOBS

被引:45
作者
KAHLBACHER, HG [1 ]
CHENG, TCE [1 ]
机构
[1] UNIV MANITOBA,DEPT ACTUARIAL & MANAGEMENT SERV,WINNIPEG R3T 2N2,MANITOBA,CANADA
关键词
D O I
10.1016/0166-218X(93)90088-6
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
We discuss the problem of scheduling a set of n independent jobs on m parallel machines to minimize costs for earliness, due date assignment and weighted number of tardy jobs. We restrict the due dates to the common due date case, but discuss some special cases for arbitrary due dates, especially we show the connection to the classical scheduling problem of minimizing the weighted number of tardy jobs on a single machine or parallel machines, respectively. For the common due date, we distinguish between two different models, namely an externally given common due date or an adjustable common due date. We give nearly a full classification for the single and multiple machine models. The only exception is a special single machine case, where we can only provide a pseudopolynomial algorithm and the complexity status of this special case remains open. For all other problems, we either develop polynomial algorithms-of order n, n log n and n4, respectively, or give NP-hardness proofs-reductions of the Knapsack problem, the even-odd-partition problem and of the NP-hard scheduling problems n Absolute value of 1 r(j) greater-than-or-equal-to 0\CBAR and n\P2 parallel-to C(max).
引用
收藏
页码:139 / 164
页数:26
相关论文
共 21 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[3]   A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH [J].
CHENG, TCE ;
SIN, CCS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (03) :271-292
[4]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[5]  
CHENG TCE, 1990, 179 U KAISERSL PREPR
[6]  
Conway R, 1967, THEORY SCHEDULING
[7]  
Derigs U, 1988, PROGRAMMING NETWORKS
[8]   MINIMIZING WAITING TIME VARIANCE IN SINGLE MACHINE PROBLEM [J].
EILON, S ;
CHOWDHURY, IG .
MANAGEMENT SCIENCE, 1977, 23 (06) :567-575
[9]   ONE-PROCESSOR SCHEDULING WITH SYMMETRIC EARLINESS AND TARDINESS PENALTIES [J].
GAREY, MR ;
TARJAN, RE ;
WILFONG, GT .
MATHEMATICS OF OPERATIONS RESEARCH, 1988, 13 (02) :330-348
[10]  
Garey MR., 1979, COMPUTERS INTRACTABI