PROBABILITY-DISTRIBUTION FOR BENEFIT COST RATIO AND NET BENEFIT

被引:20
作者
TUNG, YK
机构
[1] Dept. of Civ. Engrg, Nat. Chiao-Tung Univ, Hsinchu
来源
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE | 1992年 / 118卷 / 02期
关键词
D O I
10.1061/(ASCE)0733-9496(1992)118:2(133)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Benefit/cost ratio and net benefit are the two most commonly used criteria for evaluating the economic merit of public development projects. Due to the existence of uncertainty in cost and benefit estimations, the benefit/cost ratio and net benefit cannot be quantified with absolute certainty. In most probabilistic benefit/cost analysis the probability distributions of the benefit/cost ratio are chosen arbitrarily. The intent of this paper is to present the results from a numerical experiment in attempting to identify the appropriateness of various commonly used probability distributions in describing the random behavior of the benefit/cost ratio and net benefit of an economic development project.
引用
收藏
页码:133 / 150
页数:18
相关论文
共 17 条
[1]  
Abramowitz M., 1972, HDB MATH FUNCTIONS F
[2]  
BENJAMIN JR, 1870, PROBABILITY STATISTI
[3]  
CURTIS JH, 1941, ANN MATH STAT, V29, P563
[4]   AN APPROXIMATE METHOD FOR THE ANALYSIS OF UNCERTAINTY IN BENEFIT-COST RATIOS [J].
DANDY, GC .
WATER RESOURCES RESEARCH, 1985, 21 (03) :267-271
[5]  
Fisher R. A., 1960, TECHNOMETRICS, V2, P209, DOI [DOI 10.1080/00401706.1960.10489895, 10.1080/00401706.1960.10489895]
[6]   AN APPROACH TO RISK AND UNCERTAINTY IN BENEFIT-COST-ANALYSIS OF WATER-RESOURCES PROJECTS [J].
GOICOECHEA, A ;
KROUSE, MR ;
ANTLE, LG .
WATER RESOURCES RESEARCH, 1982, 18 (04) :791-799
[7]  
HAYYA J, 1975, MANAGE SCI, V12, P1338
[8]  
HINKLEY DV, 1969, BIOMETRIKA, V56, P635, DOI 10.1093/biomet/56.3.635
[9]  
Howe C., 1971, WATER RESOURCES MONO, V2
[10]  
James L.D., 1971, EC WATER RESOURCES P