ANALYSIS OF THE ECONOMIC-EFFECTS OF ALTERNATIVE INVESTMENT DECISIONS FOR SEAPORT SYSTEMS

被引:14
作者
KOZAN, E
机构
[1] School of Mathematics, Queensland University of Technology, Brisbane
关键词
SEAPORT; QUEUING THEORY; SIMULATION; COST-BENEFIT ANALYSIS;
D O I
10.1080/03081069408717546
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Capital budgeting techniques and queuing simulation models are integrated within an operations research framework and formulated in mathematical terms to analyse a seaport system. The analysis seeks to determine an optimal balance between the opportunity cost of ship waiting time and the cost incurred in the expansion of the seaport system. A cost benefit analysis is carried out for evaluating the alternative expansion program and their operational time tables that give the minimum present value of total costs over the planning horizon. Consequently, this study provides an integrative model framework and has developed a methodology to analyse the economic effects of alternative investment decisions at different time periods for a seaport system.
引用
收藏
页码:239 / 248
页数:10
相关论文
共 19 条
[1]  
ADLER AH, 1971, EC APPRAISAL TRANSPO
[2]   THE CRANE SCHEDULING PROBLEM [J].
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1989, 23 (03) :159-175
[3]  
DAGANZO CF, 1990, TRANSPORTATION RES R, V1251
[4]  
FRATAR T, 1961, T ASCE, V126
[5]  
JANSSON JO, 1982, MIT PRESS SERIES TRA
[6]  
KOZAN E, 1992, 4TH PORTS HARB C AUS, P239
[7]  
KOZAN E, 1978, TRANSPORTATION TECHN, V12, P37
[8]  
KOZAN E, 1992, COMPUTATIONAL MATH M
[9]  
Luce R. D., 1957, GAMES DECIS
[10]  
Nicolaou S. N., 1967, J WATERWAYS HARBORS, V93, P107