DETERMINATION OF COMPLETION TIMES FOR SERIAL MULTIPRODUCT PROCESSES .2. A MULTIUNIT FINITE INTERMEDIATE STORAGE-SYSTEM

被引:12
作者
WIEDE, W
REKLAITIS, GV
机构
[1] School of Chemical Engineering, Purdue University, West Lafayette, IN 47907, United States
关键词
Acknowledgement-Thiws ork was supportedi n part by National ScienceF oundation Grant No. CPE-79-24565;
D O I
10.1016/0098-1354(87)85016-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
7
引用
收藏
页码:345 / 356
页数:12
相关论文
共 7 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[3]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[4]  
JOHNSON SM, 1954, NAV RES LOGIST, V28, P61
[5]   GENERAL BOUNDING SCHEME FOR PERMUTATION FLOW-SHOP PROBLEM [J].
LAGEWEG, BJ ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
OPERATIONS RESEARCH, 1978, 26 (01) :53-67
[6]   DETERMINATION OF COMPLETION TIMES FOR SERIAL MULTIPRODUCT PROCESSES .1. A 2 UNIT FINITE INTERMEDIATE STORAGE-SYSTEM [J].
WIEDE, W ;
KURIYAN, K ;
REKLAITIS, GV .
COMPUTERS & CHEMICAL ENGINEERING, 1987, 11 (04) :337-344
[7]  
WIEDE W, 1984, THESIS PURDUE U