MULTILEVEL SCHEDULING OF MULTISTAGE PRODUCTION WITH LIMITED IN-PROCESS INVENTORY

被引:8
作者
SAWIK, TJ
机构
关键词
D O I
10.2307/2582402
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:651 / 664
页数:14
相关论文
共 9 条
[1]   AN EXPLICIT SOLUTION TO THE MULTILEVEL PROGRAMMING PROBLEM [J].
BARD, JF ;
FALK, JE .
COMPUTERS & OPERATIONS RESEARCH, 1982, 9 (01) :77-100
[2]   GEOMETRIC AND ALGORITHMIC DEVELOPMENTS FOR A HIERARCHICAL PLANNING PROBLEM [J].
BARD, JF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1985, 19 (03) :372-383
[3]   ON 2-LEVEL OPTIMIZATION [J].
BIALAS, WF ;
KARWAN, MH .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1982, 27 (01) :211-214
[4]  
CADAMBI BV, 1984, J OPER RES SOC, V35, P105
[5]   NETWORK APPROACH TO A MULTI-FACILITY, MULTI-PRODUCT PRODUCTION SCHEDULING PROBLEM WITHOUT BACKORDERING [J].
DORSEY, RC ;
HODGSON, TJ ;
RATLIFF, HD .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (07) :813-822
[6]   SEQUENCING 2-MACHINE FLOW-SHOPS WITH FINITE INTERMEDIATE STORAGE [J].
DUTTA, SK ;
CUNNINGHAM, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (09) :989-996
[7]   FLOWSHOP SCHEDULING WITH LIMITED TEMPORARY-STORAGE [J].
PAPADIMITRIOU, CH ;
KANELLAKIS, PC .
JOURNAL OF THE ACM, 1980, 27 (03) :533-549
[8]  
SAWIK TJ, 1982, UMM SCI B AUTOMATICS, V32, P373
[9]  
SAWIK TJ, 1984, 3RD P INT C SYST ENG