NEW TRENDS IN MACHINE SCHEDULING

被引:55
作者
BLAZEWICZ, J
FINKE, G
HAUPT, R
SCHMIDT, G
机构
[1] TECH UNIV NOVA SCOTIA,DEPT APPL MATH,HALIFAX B3J 2X4,NS,CANADA
[2] UNIV COLOGNE,D-5000 COLOGNE 41,FED REP GER
[3] TECH UNIV BERLIN,FACHBEREICH INFORMAT,D-1000 BERLIN 12,FED REP GER
关键词
D O I
10.1016/0377-2217(88)90192-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
50
引用
收藏
页码:303 / 317
页数:15
相关论文
共 50 条
[11]   FLEXIBLE MANUFACTURING SYSTEMS - A REVIEW OF ANALYTICAL MODELS [J].
BUZACOTT, JA ;
YAO, DD .
MANAGEMENT SCIENCE, 1986, 32 (07) :890-905
[12]  
Coffman E.G., 1976, COMPUTER JOB SHOP SC
[13]   A NOTE ON EXPECTED MAKESPANS FOR LARGEST-1ST SEQUENCES OF INDEPENDENT TASKS ON 2 PROCESSORS [J].
COFFMAN, EG ;
FREDERICKSON, GN ;
LUEKER, GS .
MATHEMATICS OF OPERATIONS RESEARCH, 1984, 9 (02) :260-266
[14]  
Dal Cin M., 1981, Microprocessing & Microprogramming, V7, P177, DOI 10.1016/0165-6074(81)90050-8
[15]   PREEMPTIVE SCHEDULING, LINEAR-PROGRAMMING AND NETWORK FLOWS [J].
DEWERRA, D .
SIAM JOURNAL ON ALGEBRAIC AND DISCRETE METHODS, 1984, 5 (01) :11-20
[16]  
Finke G., 1987, International Journal of Advanced Manufacturing Technology, V2, P3, DOI 10.1007/BF02601472
[17]  
French S., 1982, SEQUENCING SCHEDULIN
[18]  
Garey M. R., 1975, SIAM Journal on Computing, V4, P397, DOI 10.1137/0204035
[19]  
Garey M. R., 1975, SIAM Journal on Computing, V4, P187, DOI 10.1137/0204015
[20]  
Garey Michael R., 1979, COMPUTERS INTRACTABI