LOT SIZING POLICIES FOR FINITE PRODUCTION-RATE ASSEMBLY SYSTEMS

被引:21
作者
ATKINS, D [1 ]
QUEYRANNE, M [1 ]
SUN, DN [1 ]
机构
[1] CARIBOO UNIV COLL,KAMLOOPS,BC,CANADA
关键词
D O I
10.1287/opre.40.1.126
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
An assembly production system with n facilities has a constant external demand occurring at the end facility. Production rates at each facility are finite and nonincreasing along any path in the assembly network. Associated with each facility are a setup cost and positive echelon holding cost rate. The formulation of the lot sizing problem is developed in terms of integer-ratio lot size policies. This formulation provides a unification of the integer-split policies formulation of L. B. Schwarz and L. Schrage and the integer-multiple policies formulation of J. P. Moily, allowing either assumption to be operative at any point in the system. A relaxed solution to this unified formulation provides a lower bound to the cost of any feasible policy. The derivation of this Lower Bound Theorem is novel and relies on the notion of path holding costs, which is a generalization of echelon holding costs. An optimal power-of-two lot size policy is found by an O(n5) algorithm and its cost is within 2% of the optimum in the worst case.
引用
收藏
页码:126 / 141
页数:16
相关论文
共 12 条
[11]   MANUFACTURING CYCLE TIME DETERMINATION FOR A MULTISTAGE ECONOMIC PRODUCTION QUANTITY MODEL [J].
SZENDROVITS, AZ .
MANAGEMENT SCIENCE, 1975, 22 (03) :298-308
[12]  
ZHENG YS, 1987, THESIS COLUMBIA U NY