TOWARDS THE STANDARDIZATION OF PERFORMANCE-MEASURES FOR PROJECT SCHEDULING HEURISTICS

被引:15
作者
BADIRU, AB
机构
关键词
D O I
10.1109/17.6008
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:82 / 89
页数:8
相关论文
共 27 条
[1]  
BADIRU AB, 1984, THESIS U CENTRAL FLO
[2]  
Bailey J., 1982, INTEGRATED PRODUCTIO
[3]   HEURISTICS FOR SCHEDULING RESOURCE CONSTRAINED PROJECTS - EXPERIMENTAL INVESTIGATION [J].
COOPER, DF .
MANAGEMENT SCIENCE, 1976, 22 (11) :1186-1194
[4]  
Davis E. W., 1975, AIIE Transactions, V7, P132, DOI 10.1080/05695557508974995
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]  
DAVIS EW, 1971, AIIE T, V5, P297
[7]   ESTIMATION OF MEAN AND VARIANCE OF A PERT ACTIVITY TIME [J].
DONALDSON, WA .
OPERATIONS RESEARCH, 1965, 13 (03) :382-+
[8]   ON THE MEASUREMENT OF COMPLEXITY IN ACTIVITY NETWORKS [J].
ELMAGHRABY, SE ;
HERROELEN, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1980, 5 (04) :223-234
[9]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR
[10]  
ELSAYED EA, 1982, INT J PROD RES, V19