DEVELOPMENT OF OPERATOR ASSIGNMENT SCHEDULES - A DSS APPROACH

被引:10
作者
LUTZ, CM [1 ]
DAVIS, KR [1 ]
TURNER, CF [1 ]
机构
[1] GEORGIA SO COLL,COLL BUSINESS ADM,STATESBORO,GA 30460
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1994年 / 22卷 / 01期
关键词
BACKWARD DYNAMIC PROGRAMMING-HEURISTIC; MULTISTAGE PRODUCTION LINE; OPERATOR ASSIGNMENT SCHEDULE; SIMULATION; WORK-GROUP MATRIX;
D O I
10.1016/0305-0483(94)90007-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Being able to generate an operator assignment schedule for a (m) multi-stage, (n) operator production line, with n less or equal to m, and with multiple objectives, is a problem which continues to exist both in the literature and in practice. This paper illustrates how weighted backward dynamic programming and simulation can be combined in a decision support system (DSS) to address such a problem and to evaluate the characteristics of a dynamic production line.
引用
收藏
页码:57 / 67
页数:11
相关论文
共 12 条
[2]   TRADEOFF CURVES, TARGETING AND BALANCING IN MANUFACTURING QUEUING-NETWORKS [J].
BITRAN, GR ;
TIRUPATI, D .
OPERATIONS RESEARCH, 1989, 37 (04) :547-564
[3]   A DYNAMIC-PROGRAMMING APPROACH TO STOCHASTIC ASSEMBLY LINE BALANCING [J].
CARRAWAY, RL .
MANAGEMENT SCIENCE, 1989, 35 (04) :459-471
[4]   THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES [J].
CONWAY, R ;
MAXWELL, W ;
MCCLAIN, JO ;
THOMAS, LJ .
OPERATIONS RESEARCH, 1988, 36 (02) :229-241
[5]  
Davis K. R., 1978, Decision Sciences, V9, P452, DOI 10.1111/j.1540-5915.1978.tb00734.x
[6]  
DAVIS KR, 1975, IND ENG, V7, P30
[7]  
DAVIS KR, 1977, COMPUT OPER RES, V4, P75, DOI 10.1016/0305-0548(77)90029-6
[8]   MODEL-BASED DECISION SUPPORT SYSTEMS - AN EFFECTIVE IMPLEMENTATION FRAMEWORK [J].
FLOYD, SA ;
TURNER, CF ;
DAVIS, KR .
COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (05) :481-491
[9]   LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :409-418
[10]  
LUTZ CM, 1990, THESIS U GEORGIA