A STUDY ON DECISION RULES OF A SCHEDULING MODEL IN AN FMS

被引:31
作者
TANG, LL
YIH, YW
LIU, CY
机构
[1] NATL SUN YAT SEN UNIV, COLL MANAGEMENT, KAOHSIUNG, 47907, TAIWAN
[2] PURDUE UNIV, SCH IND ENGN, W LAFAYETTE, IN USA
关键词
FLEXIBLE MANUFACTURING SYSTEM; SCHEDULING; SIMULATION; MULTICRITERIA;
D O I
10.1016/0166-3615(93)90076-D
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Flexible manufacturing systems (FMSs) are designed to combine the efficiency of a mass-production line and the flexibility of a job shop for the batch production of a mid-volume and mid-variety of products. To control FMSs is more complex than transfer lines or job shops because of the flexibility of machines and operations. In general, FMS operation decisions can be divided into two phases: planning and scheduling. The planning phase considers the pre-arrangement of parts and tools before the FMS begins to process, and the scheduling phase deals with routing parts while the system is in operation. This paper focuses on the scheduling phase. We establish six decision points involved in the operations among parts, AGVs and machines. The dispatching rules associated are evaluated based on simulation experiments. The performance measurement is defined as a weighted index of multi-criteria, including time in system, mean tardiness, maximum tardiness, system utilization, number of machines locked, buffer size, and work in process. The Taguchi method is used in the simulation experiments to study the relationship between the multiple performance measures and the dispatching rules in six decision points.
引用
收藏
页码:1 / 13
页数:13
相关论文
共 21 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   INTELLIGENT DISPATCHING FOR FLEXIBLE MANUFACTURING [J].
CHANDRA, J ;
TALAVAGE, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (11) :2259-2278
[3]   EXPERIMENTAL INVESTIGATION OF FLEXIBLE MANUFACTURING SYSTEM SCHEDULING DECISION RULES [J].
DENZLER, DR ;
BOE, WJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (07) :979-994
[4]   BICRITERION STATIC SCHEDULING RESEARCH FOR A SINGLE-MACHINE [J].
DILEEPAN, P ;
SEN, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (01) :53-59
[5]   CHARACTERIZATION OF AUTOMATIC GUIDED VEHICLE DISPATCHING RULES [J].
EGBELU, PJ ;
TANCHOCO, JMA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :359-374
[6]   A FRAMEWORK FOR SINGLE-MACHINE MULTIPLE OBJECTIVE SEQUENCING RESEARCH [J].
FRY, TD ;
ARMSTRONG, RD ;
LEWIS, H .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1989, 17 (06) :595-607
[7]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[8]  
MAHESHWARI SK, 1991, 1991 INTERNATIONAL INDUSTRIAL ENGINEERING CONFERENCE PROCEEDINGS, P421
[9]   ANALYSIS OF SCHEDULING RULES FOR AN FMS [J].
MONTAZERI, M ;
VANWASSENHOVE, LN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (04) :785-802
[10]   SURVEY OF SCHEDULING RULES [J].
PANWALKAR, SS ;
ISKANDER, W .
OPERATIONS RESEARCH, 1977, 25 (01) :45-61